Back to Explorer
Completed
intend to install a walbox 40 amp EV Charger with Load Management Device [EMS] this will include the installation of a 40 AMP double pole circuit breaker in the garage sub panel
4917 GLOBE MALLOW DR, Austin (Travis County)
Building Permit: 3
Match confidence95%
permit_singleton
πProject Metrics
0
Started:Jan 24, 2024
Last activity:Mar 17, 2026
Duration:783 days
Project timeline
2024
Jan 24
2 yrs ago
Permit 2024-008948 EP: intend to install a walbox 40 amp EV Charger with Load Management Device [EMS] this will include the installation of a 40 AMP double pole circuit breaker in the garage sub panel
Building Permit β’ Final
Linked via: Merged
Open recordJanuary 24, 2024
2024-008948 EP
2026
Mar 16
8 days ago
Permit 2026-031535 EP: Add a 15Amp Dual-Pole Circuit breaker to the sub-panel in the garage. Run 12/2 wiring from the sub panel to the garage wall through 3/4 conduit to the outside of the garage on the back wall. Install a Dedicated Disconnect for install the mini-split Air Conditioning system.
Building Permit β’ Active
Link confidence: 100%
Open recordMarch 16, 2026
2026-031535 EP
2026
Mar 17
7 days ago
Permit 2026-032249 MP: Install a Tosot 12000 BTU 208-230v MCA 12Amp ductless Mini Split Air Conditioning and Heating system in the Garage
(Non livable area).
Building Permit β’ Active
Link confidence: 100%
Open recordMarch 17, 2026
2026-032249 MP
Linked records by source
Building Permits (3)
(source: permits)intend to install a walbox 40 amp EV Charger with Load Management Device [EMS] this will include the installation of a 40 AMP double pole circuit breaker in the garage sub panel
Final β’ Jan 24, 2024
2024-008948 EP
Description: intend to install a walbox 40 amp EV Charger with Load Management Device [EMS] this will include the installation of a 40 AMP double pole circuit breaker in the garage sub panel
Type: Electrical Permit
Location: 4917 GLOBE MALLOW DR
Add a 15Amp Dual-Pole Circuit breaker to the sub-panel in the garage. Run 12/2 wiring from the sub panel to the garage wall through 3/4 conduit to the outside of the garage on the back wall. Install a Dedicated Disconnect for install the mini-split Air Conditioning system.
Active β’ Mar 16, 2026
2026-031535 EP
Description: Add a 15Amp Dual-Pole Circuit breaker to the sub-panel in the garage. Run 12/2 wiring from the sub panel to the garage wall through 3/4 conduit to the outside of the garage on the back wall. Install a Dedicated Disconnect for install the mini-split Air Conditioning system.
Type: Electrical Permit
Location: 4917 GLOBE MALLOW DR
Install a Tosot 12000 BTU 208-230v MCA 12Amp ductless Mini Split Air Conditioning and Heating system in the Garage
(Non livable area).
Active β’ Mar 17, 2026
2026-032249 MP
Description: Install a Tosot 12000 BTU 208-230v MCA 12Amp ductless Mini Split Air Conditioning and Heating system in the Garage
(Non livable area).
Type: Mechanical Permit
Location: 4917 GLOBE MALLOW DR
Explore Related Projects
Explore Area
Project metadata
- First activity
- January 24, 2024
- Last activity
- March 17, 2026