600 Travis St. Suite 6650, Houston (Harris County)

TDLR Project: 22
Match confidence95%
tdlr_geo

📍Location & Views

Open in MapsGet Directions|29.76049, -95.36351

📊Project Metrics

TDLR #EABPRJB5812453
$26.9M
Total Value
Started:Mar 25, 2015
Last activity:Mar 18, 2026
Duration:4011 days

Project timeline

2015
Mar 25
11 yrs ago
TDLR Project: JB POINDEXTER
TDLR ProjectProject Closed
Valuation: $83K
Linked via: Merged
Open record
March 25, 2015
EABPRJB5812453
2015
Apr 1
11 yrs ago
Construction Start
TDLR ProjectProjected start
Work itemJB POINDEXTER
Start Apr 1, 2015End Jul 1, 2015
Open record
April 1, 2015
EABPRJB5812453
2015
Jul 1
11 yrs ago
Expected Completion
TDLR ProjectProjected completion
Work itemJB POINDEXTER
Start Apr 1, 2015End Jul 1, 2015
Open record
July 1, 2015
EABPRJB5812453
2018
Mar 19
8 yrs ago
TDLR Project: CHASE TOWER - TEXAS TUNNEL
TDLR ProjectReview Complete
Valuation: $300K
Linked via: Merged
Open record
March 19, 2018
EABPRJB8812768
2018
Apr 1
8 yrs ago
Construction Start
TDLR ProjectProjected start
Work itemCHASE TOWER - TEXAS TUNNEL
Start Apr 1, 2018End Dec 31, 2019
Open record
April 1, 2018
EABPRJB8812768
2019
Dec 31
6 yrs ago
Expected Completion
TDLR ProjectProjected completion
Work itemCHASE TOWER - TEXAS TUNNEL
Start Apr 1, 2018End Dec 31, 2019
Open record
December 31, 2019
EABPRJB8812768
2020
Mar 18
6 yrs ago
TDLR Project: Public corridor renovation
TDLR ProjectProject Closed
Valuation: $85K
Linked via: Merged
Open record
March 18, 2020
TABS2020013904
2020
Mar 23
6 yrs ago
Construction Start
TDLR ProjectProjected start
Work itemPublic corridor renovation
Start Mar 23, 2020End May 29, 2020
Open record
March 23, 2020
TABS2020013904
2020
May 29
6 yrs ago
Expected Completion
TDLR ProjectProjected completion
Work itemPublic corridor renovation
Start Mar 23, 2020End May 29, 2020
Open record
May 29, 2020
TABS2020013904
2020
Aug 31
6 yrs ago
TDLR Project: Willkie Farr Gallagher - Level 22 Buildout
TDLR ProjectInspection Complete
Valuation: $2.8M
Linked via: Merged
Open record
August 31, 2020
TABS2020023107
2020
Sep 15
6 yrs ago
TDLR Project: 600 Travis - Restrooms & Elevator Lobbies
TDLR ProjectInspection Complete
Valuation: $6.0M
Linked via: Merged
Open record
September 15, 2020
TABS2021000731
2020
Oct 1
5 yrs ago
Construction Start
TDLR ProjectProjected start
Work itemWillkie Farr Gallagher - Level 22 Buildout
Start Oct 1, 2020End Jan 31, 2021
Open record
October 1, 2020
TABS2020023107
2020
Oct 19
5 yrs ago
Construction Start
TDLR ProjectProjected start
Work item600 Travis - Restrooms & Elevator Lobbies
Start Oct 19, 2020End May 3, 2021
Open record
October 19, 2020
TABS2021000731
2021
Jan 31
5 yrs ago
Expected Completion
TDLR ProjectProjected completion
Work itemWillkie Farr Gallagher - Level 22 Buildout
Start Oct 1, 2020End Jan 31, 2021
Open record
January 31, 2021
TABS2020023107
2021
May 3
5 yrs ago
Expected Completion
TDLR ProjectProjected completion
Work item600 Travis - Restrooms & Elevator Lobbies
Start Oct 19, 2020End May 3, 2021
Open record
May 3, 2021
TABS2021000731
2022
Dec 16
3 yrs ago
TDLR Project: Momentum
TDLR ProjectProject Closed
Valuation: $650K
Linked via: Merged
Open record
December 16, 2022
TABS2023007715
2023
Jan 30
3 yrs ago
Construction Start
TDLR ProjectProjected start
Work itemMomentum
Start Jan 30, 2023End May 5, 2023
Open record
January 30, 2023
TABS2023007715
2023
May 5
3 yrs ago
Expected Completion
TDLR ProjectProjected completion
Work itemMomentum
Start Jan 30, 2023End May 5, 2023
Open record
May 5, 2023
TABS2023007715
2024
May 30
2 yrs ago
TDLR Project: Level 06 Restroom
TDLR ProjectReview Complete
Valuation: $120K
Linked via: Merged
Open record
May 30, 2024
TABS2024019640
2024
May 30
2 yrs ago
TDLR Project: Level 69 Restroom
TDLR ProjectReview Complete
Valuation: $120K
Linked via: Merged
Open record
May 30, 2024
TABS2024019636
2024
Jul 29
2 yrs ago
Construction Start
TDLR ProjectProjected start
Work itemLevel 06 Restroom
Start Jul 29, 2024End Dec 30, 2024
Open record
July 29, 2024
TABS2024019640
2024
Jul 29
2 yrs ago
Construction Start
TDLR ProjectProjected start
Work itemLevel 69 Restroom
Start Jul 29, 2024End Dec 30, 2024
Open record
July 29, 2024
TABS2024019636
2024
Dec 30
1 yr ago
Expected Completion
TDLR ProjectProjected completion
Work itemLevel 06 Restroom
Start Jul 29, 2024End Dec 30, 2024
Open record
December 30, 2024
TABS2024019640
2024
Dec 30
1 yr ago
Expected Completion
TDLR ProjectProjected completion
Work itemLevel 69 Restroom
Start Jul 29, 2024End Dec 30, 2024
Open record
December 30, 2024
TABS2024019636
2025
Jan 9
1 yr ago
TDLR Project: Gunvor Level 65 Expansion
TDLR ProjectReview Complete
Valuation: $2.2M
Linked via: Merged
Open record
January 9, 2025
TABS2025009117
2025
Jan 17
1 yr ago
TDLR Project: Leaf and Grain
TDLR ProjectInspection Complete
Valuation: $150K
Linked via: Merged
Open record
January 17, 2025
TABS2025009828
2025
Jan 29
1 yr ago
TDLR Project: Heidrick & Struggles Houston
TDLR ProjectProject Closed
Valuation: $400K
Linked via: Merged
Open record
January 29, 2025
TABS2025010654
2025
Feb 11
1 yr ago
TDLR Project: Starbucks
TDLR ProjectReview Complete
Valuation: $1.4M
Linked via: Merged
Open record
February 11, 2025
TABS2025011651
2025
Feb 24
1 yr ago
Construction Start
TDLR ProjectProjected start
Work itemGunvor Level 65 Expansion
Start Feb 24, 2025End Jul 31, 2025
Open record
February 24, 2025
TABS2025009117
2025
Mar 3
1 yr ago
Construction Start
TDLR ProjectProjected start
Work itemHeidrick & Struggles Houston
Start Mar 3, 2025End Jul 25, 2025
Open record
March 3, 2025
TABS2025010654
2025
Mar 4
1 yr ago
Construction Start
TDLR ProjectProjected start
Work itemStarbucks
Start Mar 4, 2025End Dec 31, 2025
Open record
March 4, 2025
TABS2025011651
2025
Mar 10
1 yr ago
Construction Start
TDLR ProjectProjected start
Work itemLeaf and Grain
Start Mar 10, 2025End May 30, 2025
Open record
March 10, 2025
TABS2025009828
2025
Mar 19
1 yr ago
TDLR Project: 8-2058_KKR - Houston
TDLR ProjectProject Registered
Valuation: $2.9M
Linked via: Merged
Open record
March 19, 2025
TABS2025014617
2025
Apr 30
11 mos ago
Construction Start
TDLR ProjectProjected start
Work item8-2058_KKR - Houston
Start Apr 30, 2025End Sep 11, 2025
Open record
April 30, 2025
TABS2025014617
2025
May 1
11 mos ago
TDLR Project: 8-2058_KKR - Houston
TDLR ProjectProject Registered
Valuation: $3.9M
Linked via: Merged
Open record
May 1, 2025
TABS2025018006
2025
May 1
11 mos ago
TDLR Project: 8-2058_KKR - Houston
TDLR ProjectProject Registered
Valuation: $650K
Linked via: Merged
Open record
May 1, 2025
TABS2025018001
2025
May 12
11 mos ago
TDLR Project: Gunvor Level 65 Expansion Updates
TDLR ProjectReview Complete
Valuation: $823K
Linked via: Merged
Open record
May 12, 2025
TABS2025018750
2025
May 27
10 mos ago
TDLR Project: SCF Partners
TDLR ProjectReview Complete
Valuation: $830K
Linked via: Merged
Open record
May 27, 2025
TABS2025019846
2025
May 30
10 mos ago
Expected Completion
TDLR ProjectProjected completion
Work itemLeaf and Grain
Start Mar 10, 2025End May 30, 2025
Open record
May 30, 2025
TABS2025009828
2025
Jun 1
10 mos ago
Construction Start
TDLR ProjectProjected start
Work item8-2058_KKR - Houston
Start Jun 1, 2025End Nov 18, 2025
Open record
June 1, 2025
TABS2025018006
2025
Jun 2
10 mos ago
Construction Start
TDLR ProjectProjected start
Work itemSCF Partners
Start Jun 2, 2025End Aug 29, 2025
Open record
June 2, 2025
TABS2025019846
2025
Jul 3
9 mos ago
TDLR Project: HKS Houston - The Office
TDLR ProjectReview Complete
Valuation: $2.4M
Linked via: Merged
Open record
July 3, 2025
TABS2025022734
2025
Jul 7
9 mos ago
Construction Start
TDLR ProjectProjected start
Work itemGunvor Level 65 Expansion Updates
Start Jul 7, 2025End Sep 12, 2025
Open record
July 7, 2025
TABS2025018750
2025
Jul 16
8 mos ago
Construction Start
TDLR ProjectProjected start
Work item8-2058_KKR - Houston
Start Jul 16, 2025End Sep 18, 2025
Open record
July 16, 2025
TABS2025018001
2025
Jul 25
8 mos ago
Expected Completion
TDLR ProjectProjected completion
Work itemHeidrick & Struggles Houston
Start Mar 3, 2025End Jul 25, 2025
Open record
July 25, 2025
TABS2025010654
2025
Jul 31
8 mos ago
Expected Completion
TDLR ProjectProjected completion
Work itemGunvor Level 65 Expansion
Start Feb 24, 2025End Jul 31, 2025
Open record
July 31, 2025
TABS2025009117
2025
Aug 29
7 mos ago
Expected Completion
TDLR ProjectProjected completion
Work itemSCF Partners
Start Jun 2, 2025End Aug 29, 2025
Open record
August 29, 2025
TABS2025019846
2025
Sep 1
7 mos ago
Construction Start
TDLR ProjectProjected start
Work itemHKS Houston - The Office
Start Sep 1, 2025End Feb 1, 2026
Open record
September 1, 2025
TABS2025022734
2025
Sep 11
6 mos ago
Expected Completion
TDLR ProjectProjected completion
Work item8-2058_KKR - Houston
Start Apr 30, 2025End Sep 11, 2025
Open record
September 11, 2025
TABS2025014617
2025
Sep 12
6 mos ago
Expected Completion
TDLR ProjectProjected completion
Work itemGunvor Level 65 Expansion Updates
Start Jul 7, 2025End Sep 12, 2025
Open record
September 12, 2025
TABS2025018750
2025
Sep 18
6 mos ago
Expected Completion
TDLR ProjectProjected completion
Work item8-2058_KKR - Houston
Start Jul 16, 2025End Sep 18, 2025
Open record
September 18, 2025
TABS2025018001
2025
Oct 13
5 mos ago
TDLR Project: Level 68 Restrooms
TDLR ProjectProject Registered
Valuation: $150K
Linked via: Merged
Open record
October 13, 2025
TABS2026003237
2025
Oct 13
5 mos ago
TDLR Project: Level 63 Restrooms
TDLR ProjectProject Registered
Valuation: $150K
Linked via: Merged
Open record
October 13, 2025
TABS2026003233
2025
Oct 28
5 mos ago
TDLR Project: ROFF
TDLR ProjectProject Registered
Valuation: $200K
Linked via: Merged
Open record
October 28, 2025
TABS2026004479
2025
Oct 31
5 mos ago
Construction Start
TDLR ProjectProjected start
Work itemLevel 63 Restrooms
Start Oct 31, 2025End Mar 31, 2026
Open record
October 31, 2025
TABS2026003233
2025
Nov 18
4 mos ago
Expected Completion
TDLR ProjectProjected completion
Work item8-2058_KKR - Houston
Start Jun 1, 2025End Nov 18, 2025
Open record
November 18, 2025
TABS2025018006
2025
Nov 26
4 mos ago
Construction Start
TDLR ProjectProjected start
Work itemROFF
Start Nov 26, 2025End Feb 28, 2026
Open record
November 26, 2025
TABS2026004479
2025
Dec 31
3 mos ago
Expected Completion
TDLR ProjectProjected completion
Work itemStarbucks
Start Mar 4, 2025End Dec 31, 2025
Open record
December 31, 2025
TABS2025011651
2026
Feb 1
2 mos ago
Expected Completion
TDLR ProjectProjected completion
Work itemHKS Houston - The Office
Start Sep 1, 2025End Feb 1, 2026
Open record
February 1, 2026
TABS2025022734
2026
Feb 28
24 days ago
Expected Completion
TDLR ProjectProjected completion
Work itemROFF
Start Nov 26, 2025End Feb 28, 2026
Open record
February 28, 2026
TABS2026004479
2026
Mar 18
6 days ago
TDLR Project: Axpo
TDLR ProjectProject Registered
Valuation: $550K
Link confidence: 100%
Open record
March 18, 2026
TABS2026015351
2026
Mar 31
7 days from now
Expected Completion
TDLR ProjectProjected completion
Work itemLevel 63 Restrooms
Start Oct 31, 2025End Mar 31, 2026
Open record
March 31, 2026
TABS2026003233
2026
Apr 15
22 days from now
Construction Start
TDLR ProjectProjected start
Work itemAxpo
Start Apr 15, 2026End Jul 17, 2026
Open record
April 15, 2026
TABS2026015351
2026
Jul 17
4 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemAxpo
Start Apr 15, 2026End Jul 17, 2026
Open record
July 17, 2026
TABS2026015351
2026
Jul 31
4 mos from now
Construction Start
TDLR ProjectProjected start
Work itemLevel 68 Restrooms
Start Jul 31, 2026End Dec 31, 2026
Open record
July 31, 2026
TABS2026003237
2026
Dec 31
9 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemLevel 68 Restrooms
Start Jul 31, 2026End Dec 31, 2026
Open record
December 31, 2026
TABS2026003237

Linked records by source

TDLR Projects (22)

(source: tabs_projects)
JB POINDEXTER
Project ClosedMar 25, 2015
EABPRJB5812453
Description: Tenant suite renovation in an existing office building
Facility: CHASE TOWER
Estimated cost: $83K
CHASE TOWER - TEXAS TUNNEL
Review CompleteMar 19, 2018
EABPRJB8812768
Description: Renovation of the tunnel to add flood door.
Facility: CHASE TOWER
Design firm: MOHLE DESIGN
Estimated cost: $300K
Public corridor renovation
Project ClosedMar 18, 2020
TABS2020013904
Description: Remodel in an existing building
Facility: Chase Tower
Design firm: K & M Design Group
Estimated cost: $85K
Sq Ft: 1,500
Willkie Farr Gallagher - Level 22 Buildout
Inspection CompleteAug 31, 2020
TABS2020023107
Description: A FULL FLOOR RENOVATION ON LEVEL 22 AND PARTIAL RENOVATION OF LEVEL 21 OF 600 TRAVIS STREET, A HIGH-RISE OFFICE TOWER IN DOWNTOWN HOUSTON. THE PLAN INCLUDES RECEPTION AREA, CONFERENCE ROOMS, PRIVATE OFFICE, BREAK ROOM AND SUPPORT SPACE FOR A FUL
Facility: Chase Tower
Design firm: Gensler
Estimated cost: $2.8M
Sq Ft: 22,000
600 Travis - Restrooms & Elevator Lobbies
Inspection CompleteSep 15, 2020
TABS2021000731
Description: Renovation of floors, walls, ceilings, doors, plumbing fixtures, and accessories in bathrooms and elevator lobbies on levels 09 - 20.
Facility: 600 Travis / Chase Tower
Design firm: Corgan
Estimated cost: $6.0M
Sq Ft: 10,000
Momentum
Project ClosedDec 16, 2022
TABS2023007715
Description: Alteration to walls, and offices.
Facility: Chase Tower
Design firm: K & M Design Group, LLP
Estimated cost: $650K
Sq Ft: 10,000
Level 06 Restroom
Review CompleteMay 30, 2024
TABS2024019640
Description: Renovations to Restrooms on Level 06
Facility: JPMorgan Chase Tower
Design firm: Inventure
Estimated cost: $120K
Sq Ft: 324
Level 69 Restroom
Review CompleteMay 30, 2024
TABS2024019636
Description: Renovations to Restrooms on Level 69
Facility: JPMorgan Chase Tower
Design firm: Inventure
Estimated cost: $120K
Sq Ft: 340
Gunvor Level 65 Expansion
Review CompleteJan 9, 2025
TABS2025009117
Description: Multi-Tenant Space Converting into full floor Tenant Space on Level 65
Facility: JPMorgan Chase Tower
Design firm: Kirksey Architecture
Estimated cost: $2.2M
Sq Ft: 17,235
Leaf and Grain
Inspection CompleteJan 17, 2025
TABS2025009828
Description: Restaurant remodel
Facility: 600 Travis Street
Design firm: LH2 Architecture LLC
Estimated cost: $150K
Sq Ft: 1,462
Heidrick & Struggles Houston
Project ClosedJan 29, 2025
TABS2025010654
Description: Renovate an existing business interior fit-out. Includes selective demolition of existing pantry and new carpet, base & paint throughout.
Facility: JP Morgan Chase Tower
Design firm: HOK Houston
Estimated cost: $400K
Sq Ft: 6,457
Starbucks
Review CompleteFeb 11, 2025
TABS2025011651
Description: Interior Renovation of Existing Interior Buildout
Facility: 600 Travis
Design firm: Ziegler Copper Architects
Estimated cost: $1.4M
Sq Ft: 1,483
8-2058_KKR - Houston
Project RegisteredMar 19, 2025
TABS2025014617
Description: Interior renovation and build-out of approximately 27,269 sf rentable square feet on the 72nd, 73rd, 74th floor(s) of the JPMorgan Chase Tower. This submission is for the scope for the 74th floor only
Facility: JPMorgan Chase Tower
Design firm: M Moser Associates
Estimated cost: $2.9M
Sq Ft: 10,560
8-2058_KKR - Houston
Project RegisteredMay 1, 2025
TABS2025018006
Description: Interior renovation and build-out of approximately 14,498 rentable square feet on the 73rd floor of the JPMorgan Chase Tower.
Facility: JPMorgan Chase Tower
Design firm: M Moser Associates
Estimated cost: $3.9M
Sq Ft: 14,498
8-2058_KKR - Houston
Project RegisteredMay 1, 2025
TABS2025018001
Description: Interior renovation and build-out of approximately 1,653 rentable square feet on the 72nd floor of the JPMorgan Chase Tower.
Facility: JPMorgan Chase Tower
Design firm: M Moser Associates
Estimated cost: $650K
Sq Ft: 1,653
Gunvor Level 65 Expansion Updates
Review CompleteMay 12, 2025
TABS2025018750
Description: Minor updates to currently leased space to add a boardroom, office and update carpet, power and lighting in select open work area.
Facility: JPMorgan Chase Tower
Design firm: Kirksey Architecture
Estimated cost: $823K
Sq Ft: 6,300
SCF Partners
Review CompleteMay 27, 2025
TABS2025019846
Description: Removal of existing flooring and installation of new flooring in areas noted. Ceiling modification in selected areas, new millwork addition, fixture relocation and paint of walls and ceilings where required. Approx. 12,000 SF.
Facility: JP Morgan Chase Tower
Design firm: MARS
Estimated cost: $830K
Sq Ft: 12,000
HKS Houston - The Office
Review CompleteJul 3, 2025
TABS2025022734
Description: Interior Buildout of a partial foor for Office space in existing High Rise
Facility: HKS Houston
Design firm: HKS
Estimated cost: $2.4M
Sq Ft: 8,600
Level 68 Restrooms
Project RegisteredOct 13, 2025
TABS2026003237
Description: RENOVATIONS TO RESTROOMS ON LEVEL 68, WHICH WILL INCLUDE UPDATING LIGHTING, POWER, AND FINISHES
Facility: JP Morgan Chase Tower
Design firm: Inventure
Estimated cost: $150K
Sq Ft: 377
Level 63 Restrooms
Project RegisteredOct 13, 2025
TABS2026003233
Description: RENOVATIONS TO RESTROOMS ON LEVEL 63, WHICH WILL INCLUDE UPDATING LIGHTING, POWER, AND FINISHES
Facility: JP Morgan Chase Tower
Design firm: Inventure
Estimated cost: $150K
Sq Ft: 697
ROFF
Project RegisteredOct 28, 2025
TABS2026004479
Description: INTERIOR RENOVATION OF EXISTING INTERIOR BUILDOUT
Facility: Chase Tower
Design firm: Ziegler Copper Architects
Estimated cost: $200K
Sq Ft: 3,380
Axpo
Project RegisteredMar 18, 2026
TABS2026015351
Description: Interior renovation of existing interior buildout
Facility: 600 Travis
Design firm: Ziegler Copper Architects
Estimated cost: $550K
Sq Ft: 5,521

Quick Actions

View on TDLRSatellite View
TDLR ID: EABPRJB5812453

Companies & Contacts

🏢
Owner
600 TRAVIS OWNER LLC
🏢
Owner
TEXAS TOWER LIMITED
🏢
Owner
HINES
🏢
Design firm
MOHLE DESIGN
🏢
Design firm
K & M Design Group
🏢
Design firm
Gensler
🏢
Design firm
Corgan
🏢
Design firm
K & M Design Group, LLP
🏢
Design firm
Inventure
🏢
Design firm
Kirksey Architecture
🏢
Design firm
LH2 Architecture LLC
🏢
Design firm
HOK Houston
🏢
Design firm
Ziegler Copper Architects
🏢
Design firm
M Moser Associates
🏢
Design firm
MARS
🏢
Design firm
HKS
🏢
Owner
CRE-HI Travis Mezz I. LLC

Project metadata

First activity
March 25, 2015
Last activity
March 18, 2026