Permitted
¿ Excavate and expose approximately 33 - 35 feet of the existing sewer line running from the home to the city cleanout. ¿ Remove and dispose of the failed sewer piping currently serving the home. ¿ Install new Schedule 40 PVC sewer piping with proper fittings and connections. ¿ Ensure the new line is installed with the correct slope and grade to provide proper drainage and meet plumbing code requirements. ¿ Reconnect the new sewer line to the existing plumbing system at the home and at the city cleanout connection. ¿ Backfill the excavated area after installation is complete.
6218 HILLSTON DR, Austin (Travis County)
Building Permit: 1
Match confidence55%
📊Project Metrics
0
Started:Mar 18, 2026
Last activity:Mar 18, 2026
Duration:—
Project timeline
2026
Mar 18
6 days ago
Permit 2026-031329 PP: ¿ Excavate and expose approximately 33 - 35 feet of the existing sewer line running from the home to the city cleanout.
¿ Remove and dispose of the failed sewer piping currently serving the home.
¿ Install new Schedule 40 PVC sewer piping with proper fittings and connections.
¿ Ensure the new line is installed with the correct slope and grade to provide proper drainage and meet plumbing code requirements.
¿ Reconnect the new sewer line to the existing plumbing system at the home and at the city cleanout connection.
¿ Backfill the excavated area after installation is complete.
Building Permit • Active
Link confidence: 100%
Open recordMarch 18, 2026
2026-031329 PP
Linked records by source
Building Permits (1)
(source: permits)¿ Excavate and expose approximately 33 - 35 feet of the existing sewer line running from the home to the city cleanout.
¿ Remove and dispose of the failed sewer piping currently serving the home.
¿ Install new Schedule 40 PVC sewer piping with proper fittings and connections.
¿ Ensure the new line is installed with the correct slope and grade to provide proper drainage and meet plumbing code requirements.
¿ Reconnect the new sewer line to the existing plumbing system at the home and at the city cleanout connection.
¿ Backfill the excavated area after installation is complete.
Active • Mar 18, 2026
2026-031329 PP
Description: ¿ Excavate and expose approximately 33 - 35 feet of the existing sewer line running from the home to the city cleanout.
¿ Remove and dispose of the failed sewer piping currently serving the home.
¿ Install new Schedule 40 PVC sewer piping with proper fittings and connections.
¿ Ensure the new line is installed with the correct slope and grade to provide proper drainage and meet plumbing code requirements.
¿ Reconnect the new sewer line to the existing plumbing system at the home and at the city cleanout connection.
¿ Backfill the excavated area after installation is complete.
Type: Plumbing Permit
Contractor: Plumbing Outfitters LLC
Location: 6218 HILLSTON DR
Explore Related Projects
Companies & Contacts
🏢
Developer
Plumbing Outfitters LLC
🏢
Contractor
Plumbing Outfitters LLC
Explore Area
Project metadata
- First activity
- March 18, 2026
- Last activity
- March 18, 2026