H-Town Burger Bar-Space 1

3100 N Terminal Rd New Terminal B N, Houston (Harris County)

TDLR Project: 24
Match confidence95%
tdlr_geo

📍Location & Views

Open in MapsGet Directions|29.98746, -95.34122

📊Project Metrics

TDLR #TABS2019017518
$89.3M
Total Value
Started:Aug 1, 2019
Last activity:Mar 17, 2026
Duration:2420 days

Project timeline

2019
Aug 1
7 yrs ago
TDLR Project: HAS PN761 Find My Car Kiosk
TDLR ProjectProject Registered
Valuation: $50K
Linked via: Merged
Open record
August 1, 2019
TABS2019017518
2019
Aug 15
7 yrs ago
Construction Start
TDLR ProjectProjected start
Work itemHAS PN761 Find My Car Kiosk
Start Aug 15, 2019End Oct 14, 2019
Open record
August 15, 2019
TABS2019017518
2019
Oct 14
6 yrs ago
Expected Completion
TDLR ProjectProjected completion
Work itemHAS PN761 Find My Car Kiosk
Start Aug 15, 2019End Oct 14, 2019
Open record
October 14, 2019
TABS2019017518
2024
Dec 19
1 yr ago
TDLR Project: Terminal B - FX Breakroom
TDLR ProjectProject Closed
Valuation: $670K
Linked via: Merged
Open record
December 19, 2024
TABS2025008141
2025
Feb 28
1 yr ago
Construction Start
TDLR ProjectProjected start
Work itemTerminal B - FX Breakroom
Start Feb 28, 2025End Jun 3, 2025
Open record
February 28, 2025
TABS2025008141
2025
Mar 11
1 yr ago
TDLR Project: United Airlines Terminal B south-Comfort Station
TDLR ProjectReview Complete
Valuation: $700K
Linked via: Merged
Open record
March 11, 2025
TABS2025013875
2025
Mar 24
1 yr ago
Construction Start
TDLR ProjectProjected start
Work itemUnited Airlines Terminal B south-Comfort Station
Start Mar 24, 2025End Jun 30, 2025
Open record
March 24, 2025
TABS2025013875
2025
Apr 4
12 mos ago
TDLR Project: United Airlines Terminal B North Club
TDLR ProjectReview Complete
Valuation: $58.9M
Linked via: Merged
Open record
April 4, 2025
TABS2025015870
2025
Jun 3
10 mos ago
Expected Completion
TDLR ProjectProjected completion
Work itemTerminal B - FX Breakroom
Start Feb 28, 2025End Jun 3, 2025
Open record
June 3, 2025
TABS2025008141
2025
Jun 20
9 mos ago
TDLR Project: UA-- TBT Terminal B South Concourse - EN-34 B South Transfer PAX B4 & B5
TDLR ProjectProject Registered
Valuation: $450K
Linked via: Merged
Open record
June 20, 2025
TABS2025021767
2025
Jun 30
9 mos ago
Expected Completion
TDLR ProjectProjected completion
Work itemUnited Airlines Terminal B south-Comfort Station
Start Mar 24, 2025End Jun 30, 2025
Open record
June 30, 2025
TABS2025013875
2025
Jul 15
8 mos ago
Construction Start
TDLR ProjectProjected start
Work itemUnited Airlines Terminal B North Club
Start Jul 15, 2025End Jul 7, 2026
Open record
July 15, 2025
TABS2025015870
2025
Aug 20
7 mos ago
TDLR Project: East End Cantina
TDLR ProjectReview Complete
Valuation: $1.0M
Linked via: Merged
Open record
August 20, 2025
TABS2025026252
2025
Aug 28
7 mos ago
TDLR Project: Bayou Riverwalk
TDLR ProjectReview Complete
Valuation: $1.5M
Linked via: Merged
Open record
August 28, 2025
TABS2025026940
2025
Aug 28
7 mos ago
TDLR Project: Blossom and Dragon
TDLR ProjectReview Complete
Valuation: $1.5M
Linked via: Merged
Open record
August 28, 2025
TABS2025026969
2025
Aug 28
7 mos ago
TDLR Project: Starbucks
TDLR ProjectReview Complete
Valuation: $1.5M
Linked via: Merged
Open record
August 28, 2025
TABS2025026971
2025
Aug 28
7 mos ago
TDLR Project: Live Oak Bar
TDLR ProjectReview Complete
Valuation: $1.5M
Linked via: Merged
Open record
August 28, 2025
TABS2025026975
2025
Aug 28
7 mos ago
TDLR Project: BOH Kitchen
TDLR ProjectReview Complete
Valuation: $1.5M
Linked via: Merged
Open record
August 28, 2025
TABS2025026981
2025
Aug 28
7 mos ago
TDLR Project: CEGM/ CIBO
TDLR ProjectReview Complete
Valuation: $1.5M
Linked via: Merged
Open record
August 28, 2025
TABS2025026938
2025
Aug 29
7 mos ago
Construction Start
TDLR ProjectProjected start
Work itemUA-- TBT Terminal B South Concourse - EN-34 B South Transfer PAX B4 & B5
Start Aug 29, 2025End Nov 14, 2025
Open record
August 29, 2025
TABS2025021767
2025
Sep 18
6 mos ago
TDLR Project: CIBO Express Gourmet Market & Starbucks- Retail 7&8
TDLR ProjectReview Complete
Valuation: $5.5M
Linked via: Merged
Open record
September 18, 2025
TABS2026001242
2025
Sep 18
6 mos ago
TDLR Project: CIBO Express Gourmet Market- Space 9
TDLR ProjectReview Complete
Valuation: $1.5M
Linked via: Merged
Open record
September 18, 2025
TABS2026001248
2025
Sep 18
6 mos ago
TDLR Project: CIBO Express Gourmet Market- Space 3
TDLR ProjectReview Complete
Valuation: $1.5M
Linked via: Merged
Open record
September 18, 2025
TABS2026001250
2025
Sep 18
6 mos ago
TDLR Project: Back of House- Dishwash and Storage- Space 4
TDLR ProjectReview Complete
Valuation: $1.0M
Linked via: Merged
Open record
September 18, 2025
TABS2026001251
2025
Sep 18
6 mos ago
TDLR Project: H-Town Burger Bar-Space 1
TDLR ProjectReview Complete
Valuation: $2.5M
Linked via: Merged
Open record
September 18, 2025
TABS2026001252
2025
Sep 18
6 mos ago
TDLR Project: Pizaro's Pizza- Space 2
TDLR ProjectReview Complete
Valuation: $1.5M
Linked via: Merged
Open record
September 18, 2025
TABS2026001238
2025
Sep 18
6 mos ago
TDLR Project: West Pier Food Hall- Space 5
TDLR ProjectReview Complete
Valuation: $1.6M
Linked via: Merged
Open record
September 18, 2025
TABS2026001244
2025
Nov 14
4 mos ago
Expected Completion
TDLR ProjectProjected completion
Work itemUA-- TBT Terminal B South Concourse - EN-34 B South Transfer PAX B4 & B5
Start Aug 29, 2025End Nov 14, 2025
Open record
November 14, 2025
TABS2025021767
2026
Jan 5
3 mos ago
Construction Start
TDLR ProjectProjected start
Work itemCIBO Express Gourmet Market- Space 3
Start Jan 5, 2026End May 27, 2026
Open record
January 5, 2026
TABS2026001250
2026
Jan 5
3 mos ago
Construction Start
TDLR ProjectProjected start
Work itemBack of House- Dishwash and Storage- Space 4
Start Jan 5, 2026End May 25, 2026
Open record
January 5, 2026
TABS2026001251
2026
Feb 2
2 mos ago
Construction Start
TDLR ProjectProjected start
Work itemCIBO Express Gourmet Market- Space 9
Start Feb 2, 2026End Jul 31, 2026
Open record
February 2, 2026
TABS2026001248
2026
Feb 2
2 mos ago
Construction Start
TDLR ProjectProjected start
Work itemWest Pier Food Hall- Space 5
Start Feb 2, 2026End Jul 31, 2026
Open record
February 2, 2026
TABS2026001244
2026
Feb 10
1 mo ago
Construction Start
TDLR ProjectProjected start
Work itemPizaro's Pizza- Space 2
Start Feb 10, 2026End Jul 3, 2026
Open record
February 10, 2026
TABS2026001238
2026
Feb 15
1 mo ago
Construction Start
TDLR ProjectProjected start
Work itemEast End Cantina
Start Feb 15, 2026End Nov 15, 2026
Open record
February 15, 2026
TABS2025026252
2026
Feb 15
1 mo ago
Construction Start
TDLR ProjectProjected start
Work itemBayou Riverwalk
Start Feb 15, 2026End Oct 15, 2026
Open record
February 15, 2026
TABS2025026940
2026
Feb 15
1 mo ago
Construction Start
TDLR ProjectProjected start
Work itemBlossom and Dragon
Start Feb 15, 2026End Oct 15, 2026
Open record
February 15, 2026
TABS2025026969
2026
Feb 15
1 mo ago
Construction Start
TDLR ProjectProjected start
Work itemStarbucks
Start Feb 15, 2026End Oct 15, 2026
Open record
February 15, 2026
TABS2025026971
2026
Feb 15
1 mo ago
Construction Start
TDLR ProjectProjected start
Work itemLive Oak Bar
Start Feb 15, 2026End Oct 15, 2026
Open record
February 15, 2026
TABS2025026975
2026
Feb 15
1 mo ago
Construction Start
TDLR ProjectProjected start
Work itemBOH Kitchen
Start Feb 15, 2026End Oct 15, 2026
Open record
February 15, 2026
TABS2025026981
2026
Feb 15
1 mo ago
Construction Start
TDLR ProjectProjected start
Work itemCEGM/ CIBO
Start Feb 15, 2026End Oct 15, 2026
Open record
February 15, 2026
TABS2025026938
2026
Feb 16
1 mo ago
Construction Start
TDLR ProjectProjected start
Work itemCIBO Express Gourmet Market & Starbucks- Retail 7&8
Start Feb 16, 2026End Jul 8, 2026
Open record
February 16, 2026
TABS2026001242
2026
Feb 25
27 days ago
TDLR Project: Sky to Trail/Lone Chimney Mercantile
TDLR ProjectProject Registered
Valuation: $650K
Link confidence: 100%
Open record
February 25, 2026
TABS2026013518
2026
Feb 26
26 days ago
Construction Start
TDLR ProjectProjected start
Work itemH-Town Burger Bar-Space 1
Start Feb 26, 2026End Jul 1, 2026
Open record
February 26, 2026
TABS2026001252
2026
Mar 12
12 days ago
TDLR Project: ROCKY MOUNTAIN CHOCOLATE FACTORY AND BLUE BELL
TDLR ProjectProject Registered
Valuation: $750K
Link confidence: 100%
Open record
March 12, 2026
TABS2026014866
2026
Mar 12
12 days ago
TDLR Project: AUNTIE ANNE'S / CINNABON
TDLR ProjectProject Registered
Valuation: $600K
Link confidence: 100%
Open record
March 12, 2026
TABS2026014870
2026
Mar 16
8 days ago
TDLR Project: JAMBA
TDLR ProjectProject Registered
Valuation: $700K
Link confidence: 100%
Open record
March 16, 2026
TABS2026015122
2026
Mar 17
7 days ago
TDLR Project: Space Corner at IAH
TDLR ProjectProject Registered
Valuation: $691K
Link confidence: 100%
Open record
March 17, 2026
TABS2026015222
2026
May 4
1 mo from now
Construction Start
TDLR ProjectProjected start
Work itemSpace Corner at IAH
Start May 4, 2026End Aug 27, 2026
Open record
May 4, 2026
TABS2026015222
2026
May 22
2 mos from now
Construction Start
TDLR ProjectProjected start
Work itemJAMBA
Start May 22, 2026End Oct 30, 2026
Open record
May 22, 2026
TABS2026015122
2026
May 25
2 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemBack of House- Dishwash and Storage- Space 4
Start Jan 5, 2026End May 25, 2026
Open record
May 25, 2026
TABS2026001251
2026
May 27
2 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemCIBO Express Gourmet Market- Space 3
Start Jan 5, 2026End May 27, 2026
Open record
May 27, 2026
TABS2026001250
2026
May 31
2 mos from now
Construction Start
TDLR ProjectProjected start
Work itemROCKY MOUNTAIN CHOCOLATE FACTORY AND BLUE BELL
Start May 31, 2026End Nov 30, 2026
Open record
May 31, 2026
TABS2026014866
2026
May 31
2 mos from now
Construction Start
TDLR ProjectProjected start
Work itemAUNTIE ANNE'S / CINNABON
Start May 31, 2026End Oct 12, 2026
Open record
May 31, 2026
TABS2026014870
2026
Jun 15
3 mos from now
Construction Start
TDLR ProjectProjected start
Work itemSky to Trail/Lone Chimney Mercantile
Start Jun 15, 2026End Oct 22, 2026
Open record
June 15, 2026
TABS2026013518
2026
Jul 1
3 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemH-Town Burger Bar-Space 1
Start Feb 26, 2026End Jul 1, 2026
Open record
July 1, 2026
TABS2026001252
2026
Jul 3
3 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemPizaro's Pizza- Space 2
Start Feb 10, 2026End Jul 3, 2026
Open record
July 3, 2026
TABS2026001238
2026
Jul 7
4 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemUnited Airlines Terminal B North Club
Start Jul 15, 2025End Jul 7, 2026
Open record
July 7, 2026
TABS2025015870
2026
Jul 8
4 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemCIBO Express Gourmet Market & Starbucks- Retail 7&8
Start Feb 16, 2026End Jul 8, 2026
Open record
July 8, 2026
TABS2026001242
2026
Jul 31
4 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemCIBO Express Gourmet Market- Space 9
Start Feb 2, 2026End Jul 31, 2026
Open record
July 31, 2026
TABS2026001248
2026
Jul 31
4 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemWest Pier Food Hall- Space 5
Start Feb 2, 2026End Jul 31, 2026
Open record
July 31, 2026
TABS2026001244
2026
Aug 27
5 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemSpace Corner at IAH
Start May 4, 2026End Aug 27, 2026
Open record
August 27, 2026
TABS2026015222
2026
Oct 12
7 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemAUNTIE ANNE'S / CINNABON
Start May 31, 2026End Oct 12, 2026
Open record
October 12, 2026
TABS2026014870
2026
Oct 15
7 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemBayou Riverwalk
Start Feb 15, 2026End Oct 15, 2026
Open record
October 15, 2026
TABS2025026940
2026
Oct 15
7 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemBlossom and Dragon
Start Feb 15, 2026End Oct 15, 2026
Open record
October 15, 2026
TABS2025026969
2026
Oct 15
7 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemStarbucks
Start Feb 15, 2026End Oct 15, 2026
Open record
October 15, 2026
TABS2025026971
2026
Oct 15
7 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemLive Oak Bar
Start Feb 15, 2026End Oct 15, 2026
Open record
October 15, 2026
TABS2025026975
2026
Oct 15
7 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemBOH Kitchen
Start Feb 15, 2026End Oct 15, 2026
Open record
October 15, 2026
TABS2025026981
2026
Oct 15
7 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemCEGM/ CIBO
Start Feb 15, 2026End Oct 15, 2026
Open record
October 15, 2026
TABS2025026938
2026
Oct 22
7 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemSky to Trail/Lone Chimney Mercantile
Start Jun 15, 2026End Oct 22, 2026
Open record
October 22, 2026
TABS2026013518
2026
Oct 30
7 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemJAMBA
Start May 22, 2026End Oct 30, 2026
Open record
October 30, 2026
TABS2026015122
2026
Nov 15
8 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemEast End Cantina
Start Feb 15, 2026End Nov 15, 2026
Open record
November 15, 2026
TABS2025026252
2026
Nov 30
8 mos from now
Expected Completion
TDLR ProjectProjected completion
Work itemROCKY MOUNTAIN CHOCOLATE FACTORY AND BLUE BELL
Start May 31, 2026End Nov 30, 2026
Open record
November 30, 2026
TABS2026014866

Linked records by source

TDLR Projects (24)

(source: tabs_projects)
HAS PN761 Find My Car Kiosk
Project RegisteredAug 1, 2019
TABS2019017518
Description: Installation of a Find My Car Kiosk in Terminal B
Facility: Terminal B
Design firm: Walker Parking Consultants
Estimated cost: $50K
Sq Ft: 50
Terminal B - FX Breakroom
Project ClosedDec 19, 2024
TABS2025008141
Description: INTERIOR RENOVATIONS FOR TERMINAL B. REMODEL OF EXISTING SPACE INTO BREAK ROOM WHICH INCLUDES ADDITION OF NEW PARTITION WALLS, REFLECTED CEILING, LIGHTS, AND MILLWORK. PROPOSED SCOPE OF WORK DOES NOT INTEND TO CHANGE ANY LIFE SAFETY SYSTEMS.
Facility: United Airlines - Terminal B
Design firm: English+Associates
Estimated cost: $670K
Sq Ft: 3,536
United Airlines Terminal B south-Comfort Station
Review CompleteMar 11, 2025
TABS2025013875
Description: Interior renovation (700sft) to an existing tenant space in Terminal B south concourse level. Includes refurbishing existing finishes, ceilings and floors. Occupants will be served by existing restrooms and egress routes
Facility: Terminal B South-Comfort Station
Design firm: PGAL
Estimated cost: $700K
Sq Ft: 700
United Airlines Terminal B North Club
Review CompleteApr 4, 2025
TABS2025015870
Description: The project is a 54000 SF interior fit-out for new IAH Terminal B North United Club, which includes multiple seating areas, kitchen, storage, back of house employee areas, and MEPFP equipment spaces. Vertical circulation is existing.
Facility: United Airlines Terminal B North Club
Design firm: SCB
Estimated cost: $58.9M
Sq Ft: 54,000
UA-- TBT Terminal B South Concourse - EN-34 B South Transfer PAX B4 & B5
Project RegisteredJun 20, 2025
TABS2025021767
Description: Gate B4 & B5 apron re-striping and equipment relocation for Terminal B-C bus transfer
Facility: IAH - Terminal B South Concourse
Estimated cost: $450K
Sq Ft: 2,000
East End Cantina
Review CompleteAug 20, 2025
TABS2025026252
Description: INTERIOR BUILDOUT WITHIN NEWLY CONSTRUCTED TERMINAL B NORTH CONCOURSE. SCOPE TO INCLUDE FABRICATED MILLWORK BAR AND CANOPY, FURNITURE, LIGHTING, BAR EQUIPMENT, AND ARCHITECTURAL FINISHES. THE PROJECT UTILIZES TERMINAL RESTROOMS AND SHARED AMENITIES.
Facility: IAH Terminal B North
Design firm: PGAL
Estimated cost: $1.0M
Sq Ft: 2,011
Bayou Riverwalk
Review CompleteAug 28, 2025
TABS2025026940
Description: INTERIOR BUILDOUT WITHIN NEWLY CONSTRUCTED TERMINAL B NORTH CONCOURSE. SCOPE TO INCLUDE FABRICATED MILLWORK BAR AND CANOPY, FURNITURE, LIGHTING, BAR EQUIPMENT, AND ARCHITECTURAL FINISHES. THE PROJECT UTILIZES TERMINAL RESTROOMS AND SHARED AMENITIES.
Facility: IAH Terminal B North
Design firm: PGAL
Estimated cost: $1.5M
Sq Ft: 17,452
Blossom and Dragon
Review CompleteAug 28, 2025
TABS2025026969
Description: INTERIOR BUILDOUT WITHIN NEWLY CONSTRUCTED TERMINAL B NORTH CONCOURSE. SCOPE TO INCLUDE FABRICATED MILLWORK BAR AND CANOPY, FURNITURE, LIGHTING, BAR EQUIPMENT, AND ARCHITECTURAL FINISHES. THE PROJECT UTILIZES TERMINAL RESTROOMS AND SHARED AMENITIES.
Facility: IAH Terminal B North
Design firm: PGAL
Estimated cost: $1.5M
Sq Ft: 1,176
Starbucks
Review CompleteAug 28, 2025
TABS2025026971
Description: INTERIOR BUILDOUT WITHIN NEWLY CONSTRUCTED TERMINAL B NORTH CONCOURSE. SCOPE TO INCLUDE FABRICATED MILLWORK BAR AND CANOPY, FURNITURE, LIGHTING, BAR EQUIPMENT, AND ARCHITECTURAL FINISHES. THE PROJECT UTILIZES TERMINAL RESTROOMS AND SHARED AMENITIES.
Facility: IAH Terminal B North
Design firm: PGAL
Estimated cost: $1.5M
Sq Ft: 3,190
Live Oak Bar
Review CompleteAug 28, 2025
TABS2025026975
Description: INTERIOR BUILDOUT WITHIN NEWLY CONSTRUCTED TERMINAL B NORTH CONCOURSE. SCOPE TO INCLUDE FABRICATED MILLWORK BAR AND CANOPY, FURNITURE, LIGHTING, BAR EQUIPMENT, AND ARCHITECTURAL FINISHES. THE PROJECT UTILIZES TERMINAL RESTROOMS AND SHARED AMENITIES.
Facility: IAH Terminal B North
Design firm: PGAL
Estimated cost: $1.5M
Sq Ft: 991
BOH Kitchen
Review CompleteAug 28, 2025
TABS2025026981
Description: INTERIOR BUILDOUT WITHIN NEWLY CONSTRUCTED TERMINAL B NORTH CONCOURSE. SCOPE TO INCLUDE FABRICATED MILLWORK BAR AND CANOPY, FURNITURE, LIGHTING, BAR EQUIPMENT, AND ARCHITECTURAL FINISHES. THE PROJECT UTILIZES TERMINAL RESTROOMS AND SHARED AMENITIES.
Facility: IAH Terminal B North
Design firm: PGAL
Estimated cost: $1.5M
Sq Ft: 2,166
CEGM/ CIBO
Review CompleteAug 28, 2025
TABS2025026938
Description: INTERIOR BUILDOUT WITHIN NEWLY CONSTRUCTED TERMINAL B NORTH CONCOURSE. SCOPE TO INCLUDE FABRICATED MILLWORK BAR AND CANOPY, FURNITURE, LIGHTING, BAR EQUIPMENT, AND ARCHITECTURAL FINISHES. THE PROJECT UTILIZES TERMINAL RESTROOMS AND SHARED AMENITIES.
Facility: IAH Terminal B North
Design firm: PGAL
Estimated cost: $1.5M
Sq Ft: 1,430
CIBO Express Gourmet Market & Starbucks- Retail 7&8
Review CompleteSep 18, 2025
TABS2026001242
Description: Tenant fit out for a new Grab and go Market and adjacent Starbucks Cafe with storage. Scope of work includes new kitchen equipment, partitions, lighting, mep, finishes and sprinkler system modifications.
Facility: George Bush Intercontinental Airport
Design firm: Nelco Architecture, Inc
Estimated cost: $5.5M
Sq Ft: 10,656
CIBO Express Gourmet Market- Space 9
Review CompleteSep 18, 2025
TABS2026001248
Description: Tenant fit out for a new grab and go market. Scope of work includes new equipment, partitions, lighting, MEP, finishes, and fire protection system
Facility: George Bush Intercontinental Airport
Design firm: Nelco Architecture
Estimated cost: $1.5M
Sq Ft: 2,544
CIBO Express Gourmet Market- Space 3
Review CompleteSep 18, 2025
TABS2026001250
Description: Tenant fit out for a new Grab and go Market. Scope of work includes new equipment, partitions, lighting, mep, finishes and fire protection systems
Facility: George Bush Intercontinental Airport
Design firm: Nelco Architecture, Inc
Estimated cost: $1.5M
Sq Ft: 1,576
Back of House- Dishwash and Storage- Space 4
Review CompleteSep 18, 2025
TABS2026001251
Description: New tenant fit out for a Dishwash Room, liquor storage and Food storage to support owner operations throughout the terminal. New finishes, lighting, kitchen equipment, MEP and Fire Protections systems.
Facility: George Bush Intercontinental Airport
Design firm: Nelco Architecture, Inc
Estimated cost: $1.0M
Sq Ft: 2,610
H-Town Burger Bar-Space 1
Review CompleteSep 18, 2025
TABS2026001252
Description: New tenant fit out for a Free Standing Bar centered in the West Pier of the Terminal. Scope of work to include new millwork, furniture, equipment, lighting, structural, MEP, and fire protection systems
Facility: George Bush Intercontinental Airport
Design firm: Nelco Architecture, Inc
Estimated cost: $2.5M
Sq Ft: 2,012
Pizaro's Pizza- Space 2
Review CompleteSep 18, 2025
TABS2026001238
Description: New tenant fit out for a quick service Pizza Concession location. Scope of work includes new kitchen, pizza oven, partitions, finishes, lighting, MEP, and fire protection systems. Scope of work area 1315sf
Facility: George Bush Intercontinental Aiport
Design firm: Nelco Architecture, inc
Estimated cost: $1.5M
Sq Ft: 1,315
West Pier Food Hall- Space 5
Review CompleteSep 18, 2025
TABS2026001244
Description: New tenant fit out of a food hall containing (3) seperate food concepts served by a singular kitchen. Scope of work includes new partitions, Seating, kitchen and bar equipment, structural, lighting, MEP & fire protection systems
Facility: George Bush Intercontinental Airport
Design firm: Nelco Architecture, LLC
Estimated cost: $1.6M
Sq Ft: 20,000
Sky to Trail/Lone Chimney Mercantile
Project RegisteredFeb 25, 2026
TABS2026013518
Description: New buildout of retal store witnin a new airport shell building erected by others
Facility: Houston George Bush Intercontinental Airport
Design firm: Civitarese Morgan
Estimated cost: $650K
Sq Ft: 1,000
ROCKY MOUNTAIN CHOCOLATE FACTORY AND BLUE BELL
Project RegisteredMar 12, 2026
TABS2026014866
Description: TENANT FINISH OUT OF AN EXISTING LEASE SPACE. IMPROVEMENTS SHALL INCLUDE COMPLETE FINISH OUT OF THE INTERIOR TO INCLUDE NEW NON-LOAD BEARING WALLS, CEILING, FLOOR FINISHES, MILLWORK, SEATING, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING.
Facility: GEORGE BUSH INTERCONTINENTAL AIRPORT
Design firm: FUSION AE, LLC
Estimated cost: $750K
Sq Ft: 702
AUNTIE ANNE'S / CINNABON
Project RegisteredMar 12, 2026
TABS2026014870
Description: TENANT FINISH OUT OF AN EXISTING LEASE SPACE. IMPROVEMENTS SHALL INCLUDE COMPLETE FINISH OUT OF THE INTERIOR TO INCLUDE NEW NON-LOAD BEARING WALLS, CEILING, FLOOR FINISHES, MILLWORK, SEATING, STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING.
Facility: GEORGE BUSH INTERCONTINENTAL AIRPORT
Design firm: FUSION AE, LLC.
Estimated cost: $600K
Sq Ft: 1,077
JAMBA
Project RegisteredMar 16, 2026
TABS2026015122
Description: TENANT FINISH OUT OF AN EXISTING LEASE SPACE. IMPROVEMENTS SHALL INCLUDE COMPLETE FINISH OUT OF THE INTERIOR TO INCLUDE NEW NON-LOAD BEARING WALLS, CEILING, FLOOR FINISHES, MILLWORK, SEATING, STRUCTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING.
Facility: George Bush Intercontinental Airport
Design firm: FUSION AE LLC
Estimated cost: $700K
Sq Ft: 946
Space Corner at IAH
Project RegisteredMar 17, 2026
TABS2026015222
Description: Interior renovation of retail space at IAH.
Facility: IAH
Estimated cost: $691K
Sq Ft: 1,175

Quick Actions

View on TDLRSatellite View
TDLR ID: TABS2019017518

Companies & Contacts

🏢
Owner
City of Houston
🏢
Owner
City of Houston / Houston Airport Systems
🏢
Design firm
Walker Parking Consultants
🏢
Owner
Houston Airport System
🏢
Design firm
English+Associates
🏢
Design firm
PGAL
🏢
Owner
Houston Airport System (HAS)
🏢
Design firm
SCB
🏢
Design firm
Nelco Architecture, Inc
🏢
Owner
City of Houston Airport System
🏢
Design firm
Civitarese Morgan
🏢
Owner
Houston Airport Systems
🏢
Design firm
FUSION AE, LLC
🏢
Owner
United Airlines, Inc.

Project metadata

First activity
August 1, 2019
Last activity
March 17, 2026