Back to Explorer
Completed
REQUEST TO DISCONNECT Installing a 7.83 kW PV solar system and 1 Tesla PW 3 We need to disconnect the power for the PW install
7300 ANAQUA DR, Austin (Travis County)
Building Permit: 4
Match confidence95%
permit_singleton
πProject Metrics
0
Started:Sep 30, 2025
Last activity:Mar 20, 2026
Duration:171 days
Project timeline
2025
Sep 30
6 mos ago
Permit 2025-122409 EP: Installing a 7.83 kW PV solar system and 1 Tesla PW 3
Building Permit β’ Final
Linked via: Merged
Open recordSeptember 30, 2025
2025-122409 EP
2025
Nov 18
4 mos ago
Permit 2025-128659 EP: REQUEST TO DISCONNECT Installing a 7.83 kW PV solar system and 1 Tesla PW 3
We need to disconnect the power for the PW install
Building Permit β’ Final
Linked via: Merged
Open recordNovember 18, 2025
2025-128659 EP
2026
Feb 3
2 mos ago
Permit 2026-011851 EP: Will be installing (1) TESLA INC. 1807000-XX-Y. The customer has an existing system that consists of (18) MISSION SOLAR ENERGY LLC MSX10-435HN0B panels and (1) TESLA INC. 1707000-XX-Y inverter/battery.
Building Permit β’ Active
Link confidence: 100%
Open recordFebruary 3, 2026
2026-011851 EP
2026
Mar 20
4 days ago
Permit 2026-033659 EP: Install Level 2 EV Charger
Building Permit β’ Active
Link confidence: 100%
Open recordMarch 20, 2026
2026-033659 EP
Linked records by source
Building Permits (4)
(source: permits)Installing a 7.83 kW PV solar system and 1 Tesla PW 3
Final β’ Sep 30, 2025
2025-122409 EP
Description: Installing a 7.83 kW PV solar system and 1 Tesla PW 3
Type: Electrical Permit
Contractor: Good Faith Energy
Location: 7300 ANAQUA DR
REQUEST TO DISCONNECT Installing a 7.83 kW PV solar system and 1 Tesla PW 3
We need to disconnect the power for the PW install
Final β’ Nov 18, 2025
2025-128659 EP
Description: REQUEST TO DISCONNECT Installing a 7.83 kW PV solar system and 1 Tesla PW 3
We need to disconnect the power for the PW install
Type: Electrical Permit
Contractor: Good Faith Energy
Location: 7300 ANAQUA DR
Will be installing (1) TESLA INC. 1807000-XX-Y. The customer has an existing system that consists of (18) MISSION SOLAR ENERGY LLC MSX10-435HN0B panels and (1) TESLA INC. 1707000-XX-Y inverter/battery.
Active β’ Feb 3, 2026
2026-011851 EP
Description: Will be installing (1) TESLA INC. 1807000-XX-Y. The customer has an existing system that consists of (18) MISSION SOLAR ENERGY LLC MSX10-435HN0B panels and (1) TESLA INC. 1707000-XX-Y inverter/battery.
Type: Electrical Permit
Contractor: Good Faith Energy
Location: 7300 ANAQUA DR
Install Level 2 EV Charger
Active β’ Mar 20, 2026
2026-033659 EP
Description: Install Level 2 EV Charger
Type: Electrical Permit
Contractor: Charge Pro LLC
Location: 7300 ANAQUA DR
Explore Related Projects
Companies & Contacts
π§°
Contractor
Good Faith EnergyFrom: Installing a 7.83 kW PV solar system and 1 Tesla PW 3
View full profile βπ’
Contractor
Charge Pro LLC
Explore Area
Project metadata
- First activity
- September 30, 2025
- Last activity
- March 20, 2026