Inspection Complete🏗️ New Construction💵 This project is privately funded, on private land for private use.

Zero degrees

800 W Whitestone Blvd,Ste B-5, Cedar Park, TX 78613, Cedar Park, TX, 78613
Final Inspection85%

📊Project Metrics

TDLR #TABS2019004497
$102K
Project Value
1,638
Square Feet
$62/sqft
Cost/SqFt
4 months
Duration
Registered:Feb 11, 2019
Start:Mar 11, 2019
Target:Jul 11, 2019

Inspection Complete

Final inspection completed, awaiting project closure

📋Scope of Work

interior finish out for a restaurant

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

📅Compliance Timeline

Project Registered
February 11, 2019
Construction Start
March 11, 2019
Expected Completion
July 11, 2019

📄Related City Permits

Building permits found at or near this location

8007 PONCHO PASS

Irrigation Installation

ActivePlumbing PermitIrrigationDec 2025
View Details
2025-160652 PP
8005 PONCHO PASS

Irrigation Installation

ActivePlumbing PermitIrrigationDec 2025
View Details
2025-160650 PP
8001 CIRCUIT OF THE AMERICAS BLVD UNIT 905

Interior finish out.

FinalMechanical PermitRemodelDec 2025
View Details
2025-096712 MP
🔧Vertex Mechanical LLC
8001 CIRCUIT OF THE AMERICAS BLVD UNIT 702

Interior finish out. [7 Day Review]

FinalMechanical PermitRemodelDec 2025
View Details
2025-096790 MP
🔧Vertex Mechanical LLC
800 CEDAR GLN

interior remodel - Home Remodel -Under house plumbing system replacement -new flooring for the house 1900 sqm -Wall and ceiling repair -replace 35¿x47¿ window with the same size and same location Kitchen Remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new AFCI outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles Master Bathroom Remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 GFCI outlets -install 2 recessed light -new cabinets countertops and tiles Second Floor Bathroom Remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 GFCI outlets -install 1 recessed light Office Renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -Install 4 new AC supply grills and extend ductwork and connect to the main HVAC System and Airhandler Bathroom Addition -Remove existing wall separating the future bathroom space from the living area to create the new layout -Install a structural wood beam to support the load-bearing requirements of the removed wall. -Frame and install new walls as per plans -install wall tiles cabinets paint walls -Install fixtures as per plans Master Bedroom Remodel -Extend Master Bedroom Closet as per design layout -install 2 new outlets as per code -install 3 recessed LED Lights and wirings Laundry Remodel -remove existing door and create new access door to water heater tank -install new cabinets

ActiveElectrical PermitAddition and RemodelDec 2025
View Details
2025-133059 EP
🔧PinPoint Electrical Systems