Slaughter Creek Greenbelt Equestrian Trail at Mary Moore Park
📊Project Metrics
TDLR #TABS2021015374Project Closed
Project has been completed and closed
📋Scope of Work
Replace existing concrete sidewalk and mounting ramp with new ADA compliant parking pad with sidewalk and new prefabricated horse mounting ramp
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
Add EV Charging
*Partial Demo* Interior remodel of single-story SFR 605 sq ft Addition to rear of existing SFR
BUILDING SIGN FLAG MOUNTED CABINET DOUBLE SIDED PUSH-THROUGH ACRYLIC LETTERING POLISHED ALUMINUM FACE ON LETTERING EDGE L I T WHITE CABINET TO BE MATTE BLACK 8 THICK POWER SUPPLY STORED WITHIN SIGN 30 SQ FT
ENTRY SIGN HALO LIT TRIMLESS STAINLESS STEEL LETTER 7 WITH A 1/4 WHITE ACRYLIC REVEAL POLISHED FINISH STUD MOUNTED FLUSH TO BACKGROUND PANEL PANEL TO BE MATTE BLACK 2 THICK PAN POWER SUPPLY STORED BEHIND PAN 39.3 SF
Replacement of complete existing central heat and air system with or without duct work