GAF Energy Tenant Improvement
๐Project Metrics
TDLR #TABS2023000784Review Complete
Design review complete, construction may proceed
๐Scope of Work
Tenant Improvement in Existing Spec Warehouse. New office areas are being proposed, while the rest of the facility is storage or automatic equipment.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$24.0M total๐Related City Permits
Building permits found at or near this location
Interior renovation - this will include new placement of sinks new storage cabinets and new custom wood seatings and custom metal floating shelves anchored..
Install 200A 120/208V overhead homebuilder loop with meter disconnect grounding and required GFCI outlets for temporary construction power.
New 2-story 1 bedroom 1 bathroom dwelling unit w/ attached accessory structure.
Level 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <10 feet New 3/4 EMT conduit to power the Level 2 EV Charger at 48amp constant draw.
Interior renovation - this will include new placement of sinks new storage cabinets and new custom wood seatings and custom metal floating shelves anchored..