Ventana West - Orchard Way
DT Finley Abstract 1903 & William Atkins Survey, Abstract 1961, Fort Worth (Tarrant County)
TDLR Project: 26
Match confidence95%
tdlr_geo
📊Project Metrics
TDLR #TABS2020012466$189.2M
Total Value
Started:Feb 27, 2020
Last activity:Mar 20, 2026
Duration:2213 days
Project timeline
2020
Feb 27
6 yrs ago
TDLR Project: A new Service Center for Old Dominion Freight Line - Ft. Worth
TDLR Project • Project Closed
Valuation: $9.0M
Linked via: Merged
Open recordFebruary 27, 2020
TABS2020012466
2020
Sep 1
6 yrs ago
Construction Start
TDLR Project • Projected start
Work itemA new Service Center for Old Dominion Freight Line - Ft. Worth
Start Sep 1, 2020→End Sep 1, 2021
September 1, 2020
TABS2020012466
2021
Apr 29
5 yrs ago
TDLR Project: Standard at Harmon Homes
TDLR Project • Project Closed
Valuation: $14.0M
Linked via: Merged
Open recordApril 29, 2021
TABS2021014435
2021
Jul 1
5 yrs ago
Construction Start
TDLR Project • Projected start
Work itemStandard at Harmon Homes
Start Jul 1, 2021→End Jan 1, 2023
July 1, 2021
TABS2021014435
2021
Sep 1
5 yrs ago
Expected Completion
TDLR Project • Projected completion
Work itemA new Service Center for Old Dominion Freight Line - Ft. Worth
Start Sep 1, 2020→End Sep 1, 2021
September 1, 2021
TABS2020012466
2021
Sep 15
5 yrs ago
Construction Start
TDLR Project • Projected start
Work itemBailey Park Phase 2
Start Sep 15, 2021→End Nov 1, 2022
September 15, 2021
TABS2023003264
2021
Sep 15
5 yrs ago
Construction Start
TDLR Project • Projected start
Work itemBailey Park Phase 3
Start Sep 15, 2021→End Jan 24, 2023
September 15, 2021
TABS2023008973
2022
Oct 15
3 yrs ago
TDLR Project: Bailey Park Phase 2
TDLR Project • Project Closed
Valuation: $163K
Linked via: Merged
Open recordOctober 15, 2022
TABS2023003264
2022
Nov 1
3 yrs ago
Expected Completion
TDLR Project • Projected completion
Work itemBailey Park Phase 2
Start Sep 15, 2021→End Nov 1, 2022
November 1, 2022
TABS2023003264
2023
Jan 1
3 yrs ago
Expected Completion
TDLR Project • Projected completion
Work itemStandard at Harmon Homes
Start Jul 1, 2021→End Jan 1, 2023
January 1, 2023
TABS2021014435
2023
Jan 9
3 yrs ago
TDLR Project: Bailey Park Phase 3
TDLR Project • Project Closed
Valuation: $89K
Linked via: Merged
Open recordJanuary 9, 2023
TABS2023008973
2023
Jan 24
3 yrs ago
Expected Completion
TDLR Project • Projected completion
Work itemBailey Park Phase 3
Start Sep 15, 2021→End Jan 24, 2023
January 24, 2023
TABS2023008973
2024
May 30
2 yrs ago
TDLR Project: QuikTrip #1874
TDLR Project • Review Complete
Valuation: $4.4M
Linked via: Merged
Open recordMay 30, 2024
TABS2024019648
2024
Sep 23
1 yr ago
Construction Start
TDLR Project • Projected start
Work itemAvondale Farms Drive Extension
Start Sep 23, 2024→End Apr 21, 2025
September 23, 2024
TABS2025016594
2024
Nov 7
1 yr ago
Construction Start
TDLR Project • Projected start
Work itemQuikTrip #1874
Start Nov 7, 2024→End Jun 14, 2025
November 7, 2024
TABS2024019648
2025
Jan 1
1 yr ago
Construction Start
TDLR Project • Projected start
Work itemWellington North Tract phase 1 pocket park B
Start Jan 1, 2025→End May 31, 2025
January 1, 2025
TABS2025011665
2025
Jan 28
1 yr ago
TDLR Project: Chapel Hill West Phase 1
TDLR Project • Review Complete
Valuation: $291K
Linked via: Merged
Open recordJanuary 28, 2025
TABS2025010528
2025
Feb 4
1 yr ago
TDLR Project: Avondale Haslet Road Reconstruction
TDLR Project • Review Complete
Valuation: $64.6M
Linked via: Merged
Open recordFebruary 4, 2025
TABS2025011020
2025
Feb 10
1 yr ago
Construction Start
TDLR Project • Projected start
Work itemChapel Hill West Phase 1
Start Feb 10, 2025→End Dec 8, 2025
February 10, 2025
TABS2025010528
2025
Feb 11
1 yr ago
TDLR Project: Wellington North Tract phase 1 pocket park B
TDLR Project • Project Closed
Valuation: $150K
Linked via: Merged
Open recordFebruary 11, 2025
TABS2025011665
2025
Feb 25
1 yr ago
TDLR Project: Bonds Ranch MF1
TDLR Project • Project Registered
Valuation: $805K
Linked via: Merged
Open recordFebruary 25, 2025
TABS2025012745
2025
Mar 1
1 yr ago
Construction Start
TDLR Project • Projected start
Work itemSouth Oak Grove
Start Mar 1, 2025→End Jun 15, 2025
March 1, 2025
TABS2025021889
2025
Mar 26
12 mos ago
TDLR Project: Chapel Hill West Phase 2
TDLR Project • Review Complete
Valuation: $56K
Linked via: Merged
Open recordMarch 26, 2025
TABS2025015132
2025
Apr 14
11 mos ago
TDLR Project: Avondale Farms Drive Extension
TDLR Project • Project Closed
Valuation: $193K
Linked via: Merged
Open recordApril 14, 2025
TABS2025016594
2025
Apr 16
11 mos ago
TDLR Project: Ascendant FW I-35 GLC Phase 2
TDLR Project • Review Complete
Valuation: $47.1M
Linked via: Merged
Open recordApril 16, 2025
TABS2025016808
2025
Apr 16
11 mos ago
TDLR Project: EMS ISD Agriculture Science Complex
TDLR Project • Review Complete
Valuation: $10.0M
Linked via: Merged
Open recordApril 16, 2025
TABS2025016811
2025
Apr 16
11 mos ago
TDLR Project: Ascendant FW I-35 GLC Phase 2
TDLR Project • Review Complete
Valuation: $12.0M
Linked via: Merged
Open recordApril 16, 2025
TABS2025016819
2025
Apr 21
11 mos ago
Construction Start
TDLR Project • Projected start
Work itemChapel Hill West Phase 2
Start Apr 21, 2025→End Sep 8, 2025
April 21, 2025
TABS2025015132
2025
Apr 21
11 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemAvondale Farms Drive Extension
Start Sep 23, 2024→End Apr 21, 2025
April 21, 2025
TABS2025016594
2025
Apr 21
11 mos ago
Construction Start
TDLR Project • Projected start
Work itemAscendant FW I-35 GLC Phase 2
Start Apr 21, 2025→End May 27, 2026
April 21, 2025
TABS2025016808
2025
Apr 21
11 mos ago
Construction Start
TDLR Project • Projected start
Work itemAscendant FW I-35 GLC Phase 2
Start Apr 21, 2025→End May 27, 2026
April 21, 2025
TABS2025016819
2025
May 2
11 mos ago
TDLR Project: 05779 Bonds Ranch FSU
TDLR Project • Project Registered
Valuation: $4.5M
Linked via: Merged
Open recordMay 2, 2025
TABS2025018091
2025
May 31
10 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemWellington North Tract phase 1 pocket park B
Start Jan 1, 2025→End May 31, 2025
May 31, 2025
TABS2025011665
2025
Jun 2
10 mos ago
Construction Start
TDLR Project • Projected start
Work itemBonds Ranch MF1
Start Jun 2, 2025→End Mar 2, 2026
June 2, 2025
TABS2025012745
2025
Jun 3
10 mos ago
TDLR Project: PANDA EXPRESS - Fort Worth (Bonds Ranch)
TDLR Project • Project Registered
Valuation: $2.0M
Linked via: Merged
Open recordJune 3, 2025
TABS2025020343
2025
Jun 10
10 mos ago
TDLR Project: Alliance MOB
TDLR Project • Project Registered
Valuation: $7.0M
Linked via: Merged
Open recordJune 10, 2025
TABS2025020910
2025
Jun 14
9 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemQuikTrip #1874
Start Nov 7, 2024→End Jun 14, 2025
June 14, 2025
TABS2024019648
2025
Jun 15
9 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemSouth Oak Grove
Start Mar 1, 2025→End Jun 15, 2025
June 15, 2025
TABS2025021889
2025
Jun 23
9 mos ago
TDLR Project: South Oak Grove
TDLR Project • Project Closed
Valuation: $90K
Linked via: Merged
Open recordJune 23, 2025
TABS2025021889
2025
Jun 26
9 mos ago
TDLR Project: Retail Shell Bldg
TDLR Project • Review Complete
Valuation: $2.5M
Linked via: Merged
Open recordJune 26, 2025
TABS2025022148
2025
Jul 1
9 mos ago
TDLR Project: Copper Ranch Retail - Building B
TDLR Project • Review Complete
Valuation: $3.3M
Linked via: Merged
Open recordJuly 1, 2025
TABS2025022531
2025
Jul 1
9 mos ago
TDLR Project: Copper Ranch Retail - Building A
TDLR Project • Review Complete
Valuation: $3.3M
Linked via: Merged
Open recordJuly 1, 2025
TABS2025022529
2025
Jul 24
8 mos ago
Construction Start
TDLR Project • Projected start
Work itemEMS ISD Agriculture Science Complex
Start Jul 24, 2025→End Sep 24, 2026
July 24, 2025
TABS2025016811
2025
Sep 1
7 mos ago
Construction Start
TDLR Project • Projected start
Work itemAlliance MOB
Start Sep 1, 2025→End Sep 1, 2026
September 1, 2025
TABS2025020910
2025
Sep 8
7 mos ago
Construction Start
TDLR Project • Projected start
Work itemAvondale Haslet Road Reconstruction
Start Sep 8, 2025→End Jul 1, 2028
September 8, 2025
TABS2025011020
2025
Sep 8
7 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemChapel Hill West Phase 2
Start Apr 21, 2025→End Sep 8, 2025
September 8, 2025
TABS2025015132
2025
Oct 1
6 mos ago
Construction Start
TDLR Project • Projected start
Work itemRetail Shell Bldg
Start Oct 1, 2025→End Apr 6, 2026
October 1, 2025
TABS2025022148
2025
Nov 3
5 mos ago
Construction Start
TDLR Project • Projected start
Work item05779 Bonds Ranch FSU
Start Nov 3, 2025→End Apr 8, 2026
November 3, 2025
TABS2025018091
2025
Nov 5
5 mos ago
TDLR Project: Prose Basswood
TDLR Project • Review Complete
Valuation: $1.5M
Linked via: Merged
Open recordNovember 5, 2025
TABS2026005083
2025
Nov 19
4 mos ago
TDLR Project: 42838 7-Eleven Fort Worth, TX
TDLR Project • Review Complete
Valuation: $1.2M
Linked via: Merged
Open recordNovember 19, 2025
TABS2026006357
2025
Nov 20
4 mos ago
Construction Start
TDLR Project • Projected start
Work itemNance Ranch Phase 1A
Start Nov 20, 2025→End Jan 19, 2026
November 20, 2025
TABS2026007169
2025
Nov 25
4 mos ago
Construction Start
TDLR Project • Projected start
Work itemVentana West - Orchard Way
Start Nov 25, 2025→End Feb 3, 2026
November 25, 2025
TABS2026007730
2025
Dec 3
4 mos ago
TDLR Project: Nance Ranch Phase 1A
TDLR Project • Project Registered
Valuation: $408K
Linked via: Merged
Open recordDecember 3, 2025
TABS2026007169
2025
Dec 8
4 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemChapel Hill West Phase 1
Start Feb 10, 2025→End Dec 8, 2025
December 8, 2025
TABS2025010528
2025
Dec 11
3 mos ago
TDLR Project: Ventana West - Orchard Way
TDLR Project • Project Registered
Valuation: $105K
Linked via: Merged
Open recordDecember 11, 2025
TABS2026007730
2026
Jan 5
3 mos ago
Construction Start
TDLR Project • Projected start
Work itemPANDA EXPRESS - Fort Worth (Bonds Ranch)
Start Jan 5, 2026→End Jan 5, 2027
January 5, 2026
TABS2025020343
2026
Jan 19
2 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemNance Ranch Phase 1A
Start Nov 20, 2025→End Jan 19, 2026
January 19, 2026
TABS2026007169
2026
Jan 20
2 mos ago
Construction Start
TDLR Project • Projected start
Work itemCopper Ranch Retail - Building B
Start Jan 20, 2026→End Jul 19, 2026
January 20, 2026
TABS2025022531
2026
Jan 20
2 mos ago
Construction Start
TDLR Project • Projected start
Work itemCopper Ranch Retail - Building A
Start Jan 20, 2026→End Jul 19, 2026
January 20, 2026
TABS2025022529
2026
Feb 1
2 mos ago
Construction Start
TDLR Project • Projected start
Work itemProse Basswood
Start Feb 1, 2026→End Mar 31, 2027
February 1, 2026
TABS2026005083
2026
Feb 3
2 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemVentana West - Orchard Way
Start Nov 25, 2025→End Feb 3, 2026
February 3, 2026
TABS2026007730
2026
Mar 2
22 days ago
Expected Completion
TDLR Project • Projected completion
Work itemBonds Ranch MF1
Start Jun 2, 2025→End Mar 2, 2026
March 2, 2026
TABS2025012745
2026
Mar 20
4 days ago
TDLR Project: Haslet Crossing Building A - Spec Office
TDLR Project • Project Registered
Valuation: $500K
Link confidence: 100%
Open recordMarch 20, 2026
TABS2026015520
2026
Apr 6
13 days from now
Expected Completion
TDLR Project • Projected completion
Work itemRetail Shell Bldg
Start Oct 1, 2025→End Apr 6, 2026
April 6, 2026
TABS2025022148
2026
Apr 6
13 days from now
Construction Start
TDLR Project • Projected start
Work item42838 7-Eleven Fort Worth, TX
Start Apr 6, 2026→End Dec 2, 2026
April 6, 2026
TABS2026006357
2026
Apr 8
15 days from now
Expected Completion
TDLR Project • Projected completion
Work item05779 Bonds Ranch FSU
Start Nov 3, 2025→End Apr 8, 2026
April 8, 2026
TABS2025018091
2026
May 1
1 mo from now
Construction Start
TDLR Project • Projected start
Work itemHaslet Crossing Building A - Spec Office
Start May 1, 2026→End Aug 1, 2026
May 1, 2026
TABS2026015520
2026
May 27
2 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemAscendant FW I-35 GLC Phase 2
Start Apr 21, 2025→End May 27, 2026
May 27, 2026
TABS2025016808
2026
May 27
2 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemAscendant FW I-35 GLC Phase 2
Start Apr 21, 2025→End May 27, 2026
May 27, 2026
TABS2025016819
2026
Jul 19
4 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemCopper Ranch Retail - Building B
Start Jan 20, 2026→End Jul 19, 2026
July 19, 2026
TABS2025022531
2026
Jul 19
4 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemCopper Ranch Retail - Building A
Start Jan 20, 2026→End Jul 19, 2026
July 19, 2026
TABS2025022529
2026
Aug 1
4 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemHaslet Crossing Building A - Spec Office
Start May 1, 2026→End Aug 1, 2026
August 1, 2026
TABS2026015520
2026
Sep 1
5 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemAlliance MOB
Start Sep 1, 2025→End Sep 1, 2026
September 1, 2026
TABS2025020910
2026
Sep 24
6 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemEMS ISD Agriculture Science Complex
Start Jul 24, 2025→End Sep 24, 2026
September 24, 2026
TABS2025016811
2026
Dec 2
8 mos from now
Expected Completion
TDLR Project • Projected completion
Work item42838 7-Eleven Fort Worth, TX
Start Apr 6, 2026→End Dec 2, 2026
December 2, 2026
TABS2026006357
2027
Jan 5
10 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemPANDA EXPRESS - Fort Worth (Bonds Ranch)
Start Jan 5, 2026→End Jan 5, 2027
January 5, 2027
TABS2025020343
2027
Mar 31
1 yr from now
Expected Completion
TDLR Project • Projected completion
Work itemProse Basswood
Start Feb 1, 2026→End Mar 31, 2027
March 31, 2027
TABS2026005083
2028
Jul 1
2 yrs from now
Expected Completion
TDLR Project • Projected completion
Work itemAvondale Haslet Road Reconstruction
Start Sep 8, 2025→End Jul 1, 2028
July 1, 2028
TABS2025011020
Linked records by source
TDLR Projects (26)
(source: tabs_projects)A new Service Center for Old Dominion Freight Line - Ft. Worth
Project Closed • Feb 27, 2020
TABS2020012466
Description: A new 75 door cross dock addition with support offices.
Facility: Old Dominion Freight Line - Ft. Worth
Design firm: Mollenkopf Design Group
Estimated cost: $9.0M
Sq Ft: 38,000
Standard at Harmon Homes
Project Closed • Apr 29, 2021
TABS2021014435
Description: New multifamily community
Facility: Standard at Harmon Homes
Design firm: Archon Corporation
Estimated cost: $14.0M
Sq Ft: 213,571
Bailey Park Phase 2
Project Closed • Oct 15, 2022
TABS2023003264
Description: Subdivision Improvements - paving, water, sanitary sewer, drainage and franchise utilities. 18 total curb ramps.
Facility: Bailey Park Phase 2
Design firm: Peloton Land Solutions
Estimated cost: $163K
Sq Ft: 19,356
Bailey Park Phase 3
Project Closed • Jan 9, 2023
TABS2023008973
Description: Subdivision Improvements - paving, water, sanitary sewer, drainage and franchise utilities. 14 total curb ramps
Facility: Bailey Park Phase 3
Design firm: Peloton Land Solutions
Estimated cost: $89K
Sq Ft: 13,500
QuikTrip #1874
Review Complete • May 30, 2024
TABS2024019648
Description: To construct convenience store with retail gasoline sale
Facility: QuikTrip #1874
Design firm: Daniel D. Filuk, Architect
Estimated cost: $4.4M
Sq Ft: 4,996
Chapel Hill West Phase 1
Review Complete • Jan 28, 2025
TABS2025010528
Description: Approximately 45,750 sf of sidewalk for collector and residential roads including 48 ramps
Facility: Single Family Subdivision Sidewalk & Barrier Free Ramps
Design firm: LJA Engineering
Estimated cost: $291K
Sq Ft: 3,954,855
Avondale Haslet Road Reconstruction
Review Complete • Feb 4, 2025
TABS2025011020
Description: Full width concrete pavement and intersection improvements, including 234,763 SF of concrete sidewalk/shared used path on each side of Avondale Haslet Road.
Facility: Avondale Haslet Road Reconstruction
Estimated cost: $64.6M
Sq Ft: 234,763
Wellington North Tract phase 1 pocket park B
Project Closed • Feb 11, 2025
TABS2025011665
Description: concrete sidewalk, site furnishings and enhanced landscape
Facility: N/A
Design firm: LJA Engineering, Inc.
Estimated cost: $150K
Sq Ft: 11,000
Bonds Ranch MF1
Project Registered • Feb 25, 2025
TABS2025012745
Description: Build and operate a rec leasing and amenity center for an apartment complex.
Facility: Rec Leasing
Design firm: Archon Corporation
Estimated cost: $805K
Sq Ft: 8,859
Chapel Hill West Phase 2
Review Complete • Mar 26, 2025
TABS2025015132
Description: Single Family Subdivision Sidewalk & Barrier Free Ramps
Facility: Chapel Hill West Phase 2 - Single Residential Family Lots
Design firm: LJA Engineering
Estimated cost: $56K
Sq Ft: 2,530,226
Avondale Farms Drive Extension
Project Closed • Apr 14, 2025
TABS2025016594
Description: 17,767 SF of 4' sidewalk, including 2 type M-2 (Fort Worth) ramps, 2 type P-1 (Fort Worth) ramps, 1 type C-3 (Fort Worth) ramp.
Facility: Pedestrian Facilities
Design firm: Winkelmann & Associates, Inc.
Estimated cost: $193K
Sq Ft: 17,767
Ascendant FW I-35 GLC Phase 2
Review Complete • Apr 16, 2025
TABS2025016808
Description: New concrete tilt-wall shell building
Facility: Building 2
Design firm: Downs Design Solutions
Estimated cost: $47.1M
Sq Ft: 1,055,306
EMS ISD Agriculture Science Complex
Review Complete • Apr 16, 2025
TABS2025016811
Description: New Agriculture Science Complex
Facility: EMS ISD Agriculture Science Complex
Design firm: VLK Architects, Inc.
Estimated cost: $10.0M
Sq Ft: 40,854
Ascendant FW I-35 GLC Phase 2
Review Complete • Apr 16, 2025
TABS2025016819
Description: New concrete tilt-wall shell building
Facility: Building 3
Design firm: Downs Design Solutions
Estimated cost: $12.0M
Sq Ft: 209,027
05779 Bonds Ranch FSU
Project Registered • May 2, 2025
TABS2025018091
Description: Ground up construction of quick service restaurant with drive-thru and stand alone canopies
Facility: Chick-Fil-A
Design firm: Mayse & Associates
Estimated cost: $4.5M
Sq Ft: 5,080
PANDA EXPRESS - Fort Worth (Bonds Ranch)
Project Registered • Jun 3, 2025
TABS2025020343
Description: New 2,697 SF Ground Up Fast-food Restaurant
Facility: PANDA EXPRESS
Design firm: idGroup
Estimated cost: $2.0M
Sq Ft: 2,697
Alliance MOB
Project Registered • Jun 10, 2025
TABS2025020910
Description: New 2-story medical office building
Facility: Alliance MOB
Design firm: VLK Architects
Estimated cost: $7.0M
Sq Ft: 22,178
South Oak Grove
Project Closed • Jun 23, 2025
TABS2025021889
Description: Sidewalk and 28 ADA curb ramps
Facility: South Oak Grove
Design firm: Pape Dawson Engineers, Inc
Estimated cost: $90K
Sq Ft: 2,300
Retail Shell Bldg
Review Complete • Jun 26, 2025
TABS2025022148
Description: new retail shell building
Facility: Rivers Edge Plaza
Design firm: icon architects, inc
Estimated cost: $2.5M
Sq Ft: 1,421
Copper Ranch Retail - Building B
Review Complete • Jul 1, 2025
TABS2025022531
Description: New Construction for a retail shell building
Facility: Building B
Design firm: O'Brien Architects
Estimated cost: $3.3M
Sq Ft: 11,972
Copper Ranch Retail - Building A
Review Complete • Jul 1, 2025
TABS2025022529
Description: New Construction for a Retail building
Facility: Building A
Design firm: O'Brien Architects
Estimated cost: $3.3M
Sq Ft: 12,037
Prose Basswood
Review Complete • Nov 5, 2025
TABS2026005083
Description: Leasing Office and Clubhouse for 288 apartment units
Facility: Prose Basswood
Design firm: HLR, Inc.
Estimated cost: $1.5M
Sq Ft: 6,154
42838 7-Eleven Fort Worth, TX
Review Complete • Nov 19, 2025
TABS2026006357
Description: Construction of one-story convenience store with fuel. Site and grading work included
Facility: 42838 7-Eleven Fort Worth, TX
Design firm: Dimension Group
Estimated cost: $1.2M
Sq Ft: 4,819
Nance Ranch Phase 1A
Project Registered • Dec 3, 2025
TABS2026007169
Description: 3,812,493 SF of Nance Ranch of new construction for 194 residential single family homes. Scope of work includes 45,752 sf of sidewalk and 27 ramps 85 LF pedestrian railing
Facility: Nance Ranch Phase 1A
Design firm: LJA Engineering
Estimated cost: $408K
Sq Ft: 3,812,493
Ventana West - Orchard Way
Project Registered • Dec 11, 2025
TABS2026007730
Description: Scope of work includes 19,528 sf of sidewalk and 10 BFR's..
Facility: Ventana West - Orchard Way
Design firm: LJA Engineering, Inc.
Estimated cost: $105K
Sq Ft: 19,528
Haslet Crossing Building A - Spec Office
Project Registered • Mar 20, 2026
TABS2026015520
Description: The proposed project is a new 2,958 square feet new office space comprising an open office area, breakroom, men's and women's multi-user restroom, and IT/server room.
Facility: Haslet Crossing Building A
Design firm: GSR Andrade Architects
Estimated cost: $500K
Sq Ft: 2,958
Quick Actions
Registered Accessibility Specialist
GARY J,JACOBS (RAS #224)
701 CANYON DR STE 110, COPPELL, TX 75019
Companies & Contacts
🏢
Owner
PMB SWFW Development Co Manager LLC
🏢
Owner
Old Dominion freight Line
🏢
Design firm
Mollenkopf Design Group
🏢
Owner
Skyline Prairie Homes, LP
🏢
Design firm
Archon Corporation
🏢
Owner
D.R. Horton - TX LTD
🏢
Design firm
Peloton Land Solutions
🏢
Owner
QT SOUTH, LLC
🏢
Design firm
Daniel D. Filuk, Architect
🏢
Owner
Bobby Samuel
🏢
Design firm
LJA Engineering
🏢
Owner
City of Fort Worth
🏢
Owner
HANOVER PROPERTY CO
🏢
Owner
HPI
🏢
Owner
Hunter Crossroads, LP
🏢
Design firm
Winkelmann & Associates, Inc.
🏢
Owner
Steven Bradford
🏢
Design firm
Downs Design Solutions
🏢
Owner
Eagle Mountain-Saginaw ISD
🏢
Design firm
VLK Architects, Inc.
🏢
Owner
Ascendant Commercial
🏢
Owner
Chick-fil-A
🏢
Design firm
Mayse & Associates
🏢
Owner
Panda Restaurant Group, Inc.
🏢
Design firm
idGroup
🏢
Owner
Street Realty
🏢
Design firm
Pape Dawson Engineers, Inc
🏢
Owner
Rivers Edge NEC LP
🏢
Design firm
icon architects, inc
🏢
Owner
Direct Retail Partners
🏢
Design firm
O'Brien Architects
🏢
Owner
Prose Basswood Owner, LLC
🏢
Design firm
HLR, Inc.
🏢
Owner
CB-Direct Bonds Ranch LP
🏢
Design firm
Dimension Group
🏢
Owner
DR Horton Inc.
🏢
Owner
SRPF C/Haslet Crossing, LP
🏢
Design firm
GSR Andrade Architects
Explore Area
Project metadata
- First activity
- February 27, 2020
- Last activity
- March 20, 2026