Project intelligenceTDLR TABS2025016808New Construction
Funding type

This project is privately funded, on private land for private use.

Ascendant FW I-35 GLC Phase 2

S Freeway & W Rendon Crowley Rd Fort Worth, Texas, Fort Worth, TX, 76028

Construction complete · Jun 2026Inspection Complete

Ascendant FW I-35 GLC Phase 2 is a new construction project at S Freeway & W Rendon Crowley Rd Fort Worth, Texas, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $47.1M across about 1,055,306 sq ft.

Estimated project value
$47.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,055,306 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$45/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 16, 2025430 days across supplied datesJun 20, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    5 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    401 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    24 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76028 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

Ascendant FW I-35 GLC Phase 2 is a New Construction project located at S Freeway & W Rendon Crowley Rd Fort Worth, Texas, Fort Worth, TX 76028 in Fort Worth, Texas. The project has an estimated value of $47.1M covering 1,055,306 sq ft. FW I-35 Logistics 2 LLC is the property owner and Downs Design Solutions is the design firm of record. The project was registered with TDLR on April 16, 2025.

Frequently Asked Questions

What is Ascendant FW I-35 GLC Phase 2?

Ascendant FW I-35 GLC Phase 2 is a new construction project at S Freeway & W Rendon Crowley Rd Fort Worth, Texas in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New concrete tilt-wall shell building

Is Ascendant FW I-35 GLC Phase 2 open in Fort Worth?

Construction on Ascendant FW I-35 GLC Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is Ascendant FW I-35 GLC Phase 2 located?

Ascendant FW I-35 GLC Phase 2 is located at S Freeway & W Rendon Crowley Rd Fort Worth, Texas, Fort Worth, TX, 76028, in Tarrant County.

Who is the owner or developer of Ascendant FW I-35 GLC Phase 2?

FW I-35 Logistics 2 LLC is the property owner/developer of record for Ascendant FW I-35 GLC Phase 2, per its TDLR project registration.

Who is the architect or design firm for Ascendant FW I-35 GLC Phase 2?

Downs Design Solutions is the design firm of record for Ascendant FW I-35 GLC Phase 2, according to its TDLR filing.

How much does Ascendant FW I-35 GLC Phase 2 cost and how big is it?

Ascendant FW I-35 GLC Phase 2 has an estimated construction value of $47.1M and approximately 1,055,306 square feet (about $45/sqft), based on its TDLR filing.

Scope of Work

New concrete tilt-wall shell building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

S Freeway & W Rendon Crowley Rd Fort Worth, Texas, Fort Worth, TX, 76028

Location by street address

Watch all construction in 76028 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.