Texas sector intelligence

Texas Solar & Clean-Energy Construction

Understand the investment. Find the emerging locations. Go from the big picture to the public record.

Search sector filings

Sector composition

How much is still active?

10.7%of estimated value
Active in snapshot
$88M
Other tracked filings
$732M

Active means the filing’s estimated completion was on or after the snapshot date. Other filings are not necessarily completed.

Texas · TDLR public records

Sector snapshot

Total estimated construction value

$820M

188
Filings tracked
46
Counties
80
Cities

Sector totals computed October 8, 2026.

Explore filings
Zabalist / visual intelligence

The projects behind the numbers

Explore the shape of investment, compare individual filings, and see their estimated completion dates. Select a project to inspect its record.

15 featured TDLR filings · not the entire sector
Estimated construction value$218.2MSum of 15 shown records with value
Records in view15 / 15Ready to inspect and compare
Largest record’s share66.5%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect0 without reported value
15 featured TDLR filings · not the entire sector

Comparisons use only these 15 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

The sector, explained

What solar projects are being built in Texas?

Texas leads the United States in new solar generation, and that build-out shows up in the construction record as solar manufacturing plants, operations-and-maintenance (O&M) buildings and project facilities. Zabalist tracks 188 solar and clean-energy facility filings across 46 counties — a combined $820M in estimated value — including solar-panel manufacturers like Canadian Solar, Mission Solar and Toyo Solar. Each project below links to its verified permit record, drawn from Texas Department of Licensing and Regulation (TDLR) public filings.

This page covers solar facility and manufacturing construction; the utility-scale panel arrays themselves are permitted through separate energy and county processes.

Where Texas solar facilities are being built

Houston & Gulf Coast

Solar-panel manufacturing and assembly in Harris County (Toyo Solar, Imperial Star Solar near Tomball).

San Antonio & South Texas

Mission Solar Energy panel manufacturing in Bexar County and project facilities across South Texas.

Dallas–Fort Worth

Canadian Solar and other clean-energy facilities in Dallas and Collin counties.

Rural & West Texas

Operations-and-maintenance buildings serving large solar farms across the Panhandle and Hill Country.

Browse any city or search all Texas construction projects.

Why is solar growing so fast in Texas?

Texas has the most solar capacity of any U.S. state, driven by abundant sunshine, cheap land, a deregulated ERCOT market and federal clean-energy incentives that have also drawn panel manufacturers to the state. The facility footprint is visible in the permit record — Zabalist tracks 188 solar and clean-energy building filings totaling roughly $820M, from Gulf Coast manufacturing plants to O&M buildings across rural Texas.

These figures are derived from construction filings registered with the Texas Department of Licensing and Regulation. See our data sources for methodology and provenance.

Bidding on a Texas solar or clean-energy project?

Solar facility construction runs on electrical, concrete and structural trades. Find verified Texas contractors with real permit history, or track who is winning the work:

Explore Texas construction by sector

Texas solar construction — FAQ

What solar projects are being built in Texas?

Zabalist tracks 188 solar and clean-energy facility construction filings across 46 Texas counties, totaling roughly $820M. These include solar-panel manufacturing plants (Canadian Solar, Mission Solar, Toyo Solar, Imperial Star Solar) and operations-and-maintenance buildings serving large solar farms.

Does Texas lead the U.S. in solar?

Yes. Texas has the largest installed and pipeline solar capacity of any U.S. state, helped by abundant sunshine, low land costs, the deregulated ERCOT market, and federal clean-energy incentives that have also attracted panel manufacturing to the state.

Why are solar farms not listed individually here?

Utility-scale solar arrays are permitted through separate energy-infrastructure and county processes, not the TDLR accessibility filings Zabalist aggregates. This page covers the buildings tied to solar — manufacturing plants, O&M facilities and project offices — which do appear in the public construction record.

How can I find solar construction projects to bid on in Texas?

Each facility on Zabalist links to its full permit record with the owner, location and timeline. Electrical, concrete, excavation and mechanical subcontractors can use the verified contractor directory and the active Texas bids feed to identify solar facility work.

Is Texas solar facility construction data public record?

Yes. Solar manufacturing and facility construction in Texas is registered with the Department of Licensing and Regulation (TDLR) for accessibility review, creating a public record. Zabalist aggregates these filings.