Charger Solar O&M Facility
Charger Solar O&M Facility is a new construction project at 144 HWY 239 E TIVOLI, TX, 77990, Tivoli, in Refugio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $2.2M across about 1,410 sq ft.
๐Project Metrics
TDLR #TABS2026016562Inspection Complete
Final inspection completed, awaiting project closure
Charger Solar O&M Facility is a New Construction project located at 144 HWY 239 E TIVOLI, TX, 77990, Tivoli, TX 77990 in Tivoli, Texas. The project has an estimated value of $2.2M covering 1,410 sq ft. KOC Land, LP is the property owner and MBA Energy And Industrial is the design firm of record. The project was registered with TDLR on April 1, 2026.
โFrequently Asked Questions
What is Charger Solar O&M Facility?
Charger Solar O&M Facility is a new construction project at 144 HWY 239 E TIVOLI, TX, 77990 in Tivoli, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: scope of work consists of a prefabricated modular building on concrete footings and a slab on grade slab for connex buildings, also a storage shed for a water tank that will provide water to the modular.
Is Charger Solar O&M Facility open in Tivoli?
Construction on Charger Solar O&M Facility is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Where is Charger Solar O&M Facility located?
Charger Solar O&M Facility is located at 144 HWY 239 E TIVOLI, TX, 77990, Tivoli, TX, 77990, in Refugio County.
Who is the owner or developer of Charger Solar O&M Facility?
KOC Land, LP is the property owner/developer of record for Charger Solar O&M Facility, per its TDLR project registration.
Who is the architect or design firm for Charger Solar O&M Facility?
MBA Energy And Industrial is the design firm of record for Charger Solar O&M Facility, according to its TDLR filing.
How much does Charger Solar O&M Facility cost and how big is it?
Charger Solar O&M Facility has an estimated construction value of $2.2M and approximately 1,410 square feet (about $1.57K/sqft), based on its TDLR filing.
๐Scope of Work
scope of work consists of a prefabricated modular building on concrete footings and a slab on grade slab for connex buildings, also a storage shed for a water tank that will provide water to the modular.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 1, 2026
Review Complete
Apr 1, 2026
Inspection Complete
Apr 5, 2026
Closed
4d
Construction phase
๐Related Projects
๐๏ธSame Design Firm
$52.2M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Refugio County
Find General Contractors in Refugio