This will be a selective alteration on twoHydraulic elevators serving the FC1 office building. The resultant elevatorsystem will maximize the reliability and extend the usable lifespan of theequipment. The design shall be as energy efficient as possible. The projectwill correct code violations within the hoistway, pit, machinery space, andcontrol room. The intent is to create a system with the longest life span andmake it as reliable possible. All parts of the elevator system will be broughtinto compliance with the latest adopted codes. The latest technology shall beutilized to provide the most current safety features available. The buildingwill be continually occupied during the construction period. The contractorwill need to provide an accessible route for the buildingβs occupants andalways keep one elevator in service. Temporary screening shall be installedinside the hoistway during the construction process to protect the workersinside the hoistway and to prevent interference with the car left in operation.The contractor shall provide routine monthly service and respond to calls forrepair or entrapment twenty-four hours a day on the car that is in operationfor the entire period of construction and warranty.
ESBD_493472_1772488972256_721-26063 - FC1 Elevator Modernization FINAL.pdf
Bid document
ESBD_493472_1772489006085_Exhibit A - FC1 Elevator Modernization Scope of Work.pdf
Scope of Work
Documents available on the original posting.
SZB CP964513 26CSP004 Plaza Renovation
Operational Readiness
CAM-CP577221-26JOC4100-GENERAL CONSTRUCTION JOC
MSH BRK CP1012309 26CSP003 APT Phase 12 Upgrade
APT Phase 12 HVAC Upgrade
This agency has awarded 8 contracts totaling $1.55M
Okonite Cable Supply and Related Services
PPE CP954410 25CSP007 Replace Existing Fire Alarm System
Johnson Wildflower Center-demo of greenhouses, landscape restoration, irrigation repair, road repair
DTB CP1006704 25CMR010 Dinosaur Trackways Building 2026
RFP-CMR1551-250003 Biological Laboratories Building (BIO) Renovation CMR
RFQ_Peter T. Flawn Academic Center (FAC) - Full Remodel FAC 21
(EME) (PRC 133) CEER Steam Boiler Replacement
CAM-CP577221-25JOC3800-IDIQ Flooring Services
University Of Texas At Austin
π University
Agency #721
View all University Of Texas At Austin bids βView the official posting on TX SmartBuy
View on TX SmartBuy