Permitted
Deutser Remodel
5847 SAN FELIPE, SUITE 2500, Houston (Harris County)
TDLR Project: 21
Match confidence95%
tdlr_geo
📊Project Metrics
TDLR #EABPRJB0806642$11.5M
Total Value
Started:Feb 9, 2010
Last activity:Mar 17, 2026
Duration:5880 days
Project timeline
2010
Feb 1
16 yrs ago
Construction Start
TDLR Project • Projected start
Work itemPRIDE- SIMULATOR LEVEL 35
Start Feb 1, 2010→End Apr 1, 2010
February 1, 2010
EABPRJB0806642
2010
Feb 9
16 yrs ago
TDLR Project: PRIDE- SIMULATOR LEVEL 35
TDLR Project • Project Closed
Valuation: $170K
Linked via: Merged
Open recordFebruary 9, 2010
EABPRJB0806642
2010
Apr 1
16 yrs ago
Expected Completion
TDLR Project • Projected completion
Work itemPRIDE- SIMULATOR LEVEL 35
Start Feb 1, 2010→End Apr 1, 2010
April 1, 2010
EABPRJB0806642
2015
May 1
11 yrs ago
Construction Start
TDLR Project • Projected start
Work itemE1CORPORATION
Start May 1, 2015→End Aug 1, 2015
May 1, 2015
EABPRJB5815387
2015
May 7
11 yrs ago
TDLR Project: E1CORPORATION
TDLR Project • Project Closed
Valuation: $75K
Linked via: Merged
Open recordMay 7, 2015
EABPRJB5815387
2015
Aug 1
11 yrs ago
Expected Completion
TDLR Project • Projected completion
Work itemE1CORPORATION
Start May 1, 2015→End Aug 1, 2015
August 1, 2015
EABPRJB5815387
2019
Aug 5
7 yrs ago
TDLR Project: Ensco 33, 35, 38, & 39
TDLR Project • Project Closed
Valuation: $300K
Linked via: Merged
Open recordAugust 5, 2019
TABS2019017680
2019
Sep 1
7 yrs ago
Construction Start
TDLR Project • Projected start
Work itemEnsco 33, 35, 38, & 39
Start Sep 1, 2019→End Dec 1, 2019
September 1, 2019
TABS2019017680
2019
Dec 1
6 yrs ago
Expected Completion
TDLR Project • Projected completion
Work itemEnsco 33, 35, 38, & 39
Start Sep 1, 2019→End Dec 1, 2019
December 1, 2019
TABS2019017680
2020
Apr 15
6 yrs ago
TDLR Project: ELEVATOR LOBBY, CORRIDORS, AND RESTROOMS - LEVEL 20
TDLR Project • Project Closed
Valuation: $220K
Linked via: Merged
Open recordApril 15, 2020
TABS2020015648
2020
Apr 15
6 yrs ago
TDLR Project: ELEVATOR LOBBY & CORRIDORS - LEVEL 15
TDLR Project • Project Closed
Valuation: $100K
Linked via: Merged
Open recordApril 15, 2020
TABS2020015641
2020
May 4
6 yrs ago
Construction Start
TDLR Project • Projected start
Work itemELEVATOR LOBBY, CORRIDORS, AND RESTROOMS - LEVEL 20
Start May 4, 2020→End Jan 31, 2021
May 4, 2020
TABS2020015648
2020
May 4
6 yrs ago
Construction Start
TDLR Project • Projected start
Work itemELEVATOR LOBBY & CORRIDORS - LEVEL 15
Start May 4, 2020→End Jun 29, 2020
May 4, 2020
TABS2020015641
2020
Jun 29
6 yrs ago
Expected Completion
TDLR Project • Projected completion
Work itemELEVATOR LOBBY & CORRIDORS - LEVEL 15
Start May 4, 2020→End Jun 29, 2020
June 29, 2020
TABS2020015641
2021
Jan 31
5 yrs ago
Expected Completion
TDLR Project • Projected completion
Work itemELEVATOR LOBBY, CORRIDORS, AND RESTROOMS - LEVEL 20
Start May 4, 2020→End Jan 31, 2021
January 31, 2021
TABS2020015648
2021
Oct 7
4 yrs ago
TDLR Project: Ready Right Away
TDLR Project • Project Registered
Valuation: $475K
Linked via: Merged
Open recordOctober 7, 2021
TABS2022002611
2021
Nov 7
4 yrs ago
Construction Start
TDLR Project • Projected start
Work itemReady Right Away
Start Nov 7, 2021→End Feb 7, 2022
November 7, 2021
TABS2022002611
2022
Feb 7
4 yrs ago
Expected Completion
TDLR Project • Projected completion
Work itemReady Right Away
Start Nov 7, 2021→End Feb 7, 2022
February 7, 2022
TABS2022002611
2022
Oct 14
3 yrs ago
October 14, 2022
TABS2023003237
2022
Nov 11
3 yrs ago
Construction Start
TDLR Project • Projected start
Work itemRecru
Start Nov 11, 2022→End Feb 13, 2023
November 11, 2022
TABS2023003237
2023
Feb 13
3 yrs ago
Expected Completion
TDLR Project • Projected completion
Work itemRecru
Start Nov 11, 2022→End Feb 13, 2023
February 13, 2023
TABS2023003237
2024
Sep 11
2 yrs ago
Construction Start
TDLR Project • Projected start
Work itemCLEAR TRAIL ADVISORS
Start Sep 11, 2024→End Dec 12, 2025
September 11, 2024
TABS2025025397
2024
Sep 27
1 yr ago
TDLR Project: Partners Real Estate
TDLR Project • Project Closed
Valuation: $2.5M
Linked via: Merged
Open recordSeptember 27, 2024
TABS2025001969
2024
Oct 31
1 yr ago
Construction Start
TDLR Project • Projected start
Work itemPartners Real Estate
Start Oct 31, 2024→End Feb 28, 2025
October 31, 2024
TABS2025001969
2025
Jan 22
1 yr ago
TDLR Project: First American Title
TDLR Project • Review Complete
Valuation: $550K
Linked via: Merged
Open recordJanuary 22, 2025
TABS2025010125
2025
Feb 18
1 yr ago
TDLR Project: Partners Real Estate Expansion
TDLR Project • Review Complete
Valuation: $64K
Linked via: Merged
Open recordFebruary 18, 2025
TABS2025012223
2025
Feb 19
1 yr ago
Construction Start
TDLR Project • Projected start
Work itemFirst American Title
Start Feb 19, 2025→End Jun 30, 2025
February 19, 2025
TABS2025010125
2025
Feb 28
1 yr ago
February 28, 2025
TABS2025013086
2025
Feb 28
1 yr ago
Expected Completion
TDLR Project • Projected completion
Work itemPartners Real Estate
Start Oct 31, 2024→End Feb 28, 2025
February 28, 2025
TABS2025001969
2025
Mar 3
1 yr ago
Construction Start
TDLR Project • Projected start
Work itemPartners Real Estate Expansion
Start Mar 3, 2025→End Apr 30, 2025
March 3, 2025
TABS2025012223
2025
Apr 25
11 mos ago
Construction Start
TDLR Project • Projected start
Work itemGallagher
Start Apr 25, 2025→End Jul 26, 2025
April 25, 2025
TABS2025013086
2025
Apr 30
11 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemPartners Real Estate Expansion
Start Mar 3, 2025→End Apr 30, 2025
April 30, 2025
TABS2025012223
2025
May 20
10 mos ago
TDLR Project: STRAKE FOUNDATION
TDLR Project • Review Complete
Valuation: $100K
Linked via: Merged
Open recordMay 20, 2025
TABS2025019414
2025
Jun 5
10 mos ago
June 5, 2025
TABS2025020582
2025
Jun 17
9 mos ago
Construction Start
TDLR Project • Projected start
Work itemSTRAKE FOUNDATION
Start Jun 17, 2025→End Sep 10, 2025
June 17, 2025
TABS2025019414
2025
Jun 30
9 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemFirst American Title
Start Feb 19, 2025→End Jun 30, 2025
June 30, 2025
TABS2025010125
2025
Jul 26
8 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemGallagher
Start Apr 25, 2025→End Jul 26, 2025
July 26, 2025
TABS2025013086
2025
Aug 1
8 mos ago
Construction Start
TDLR Project • Projected start
Work itemSpec Suite
Start Aug 1, 2025→End Nov 1, 2025
August 1, 2025
TABS2025020582
2025
Aug 7
8 mos ago
TDLR Project: CLEAR TRAIL ADVISORS
TDLR Project • Review Complete
Valuation: $170K
Linked via: Merged
Open recordAugust 7, 2025
TABS2025025397
2025
Aug 29
7 mos ago
TDLR Project: Josephson Dunlap
TDLR Project • Review Complete
Valuation: $1.0M
Linked via: Merged
Open recordAugust 29, 2025
TABS2025027087
2025
Sep 10
7 mos ago
TDLR Project: Spec Suite 2450 and Building Corridor
TDLR Project • Review Complete
Valuation: $150K
Linked via: Merged
Open recordSeptember 10, 2025
TABS2026000598
2025
Sep 10
7 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemSTRAKE FOUNDATION
Start Jun 17, 2025→End Sep 10, 2025
September 10, 2025
TABS2025019414
2025
Oct 3
6 mos ago
Construction Start
TDLR Project • Projected start
Work itemJosephson Dunlap
Start Oct 3, 2025→End Jan 10, 2026
October 3, 2025
TABS2025027087
2025
Oct 10
6 mos ago
TDLR Project: Deutser Remodel
TDLR Project • Review Complete
Valuation: $160K
Linked via: Merged
Open recordOctober 10, 2025
TABS2026003123
2025
Nov 1
5 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemSpec Suite
Start Aug 1, 2025→End Nov 1, 2025
November 1, 2025
TABS2025020582
2025
Nov 3
5 mos ago
Construction Start
TDLR Project • Projected start
Work itemSpec Suite 2450 and Building Corridor
Start Nov 3, 2025→End Dec 22, 2025
November 3, 2025
TABS2026000598
2025
Dec 1
4 mos ago
Construction Start
TDLR Project • Projected start
Work itemDeutser Remodel
Start Dec 1, 2025→End Jan 15, 2026
December 1, 2025
TABS2026003123
2025
Dec 12
3 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemCLEAR TRAIL ADVISORS
Start Sep 11, 2024→End Dec 12, 2025
December 12, 2025
TABS2025025397
2025
Dec 22
3 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemSpec Suite 2450 and Building Corridor
Start Nov 3, 2025→End Dec 22, 2025
December 22, 2025
TABS2026000598
2026
Jan 10
2 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemJosephson Dunlap
Start Oct 3, 2025→End Jan 10, 2026
January 10, 2026
TABS2025027087
2026
Jan 15
2 mos ago
Expected Completion
TDLR Project • Projected completion
Work itemDeutser Remodel
Start Dec 1, 2025→End Jan 15, 2026
January 15, 2026
TABS2026003123
2026
Feb 4
2 mos ago
TDLR Project: Newmark
TDLR Project • Project Registered
Valuation: $115K
Link confidence: 100%
Open recordFebruary 4, 2026
TABS2026011737
2026
Mar 5
19 days ago
TDLR Project: Rothschild & Co
TDLR Project • Project Registered
Valuation: $190K
Link confidence: 100%
Open recordMarch 5, 2026
TABS2026014231
2026
Mar 9
15 days ago
Construction Start
TDLR Project • Projected start
Work itemRothschild & Co
Start Mar 9, 2026→End Oct 31, 2026
March 9, 2026
TABS2026014231
2026
Mar 17
7 days ago
TDLR Project: GRSM Houston Relocation
TDLR Project • Project Registered
Valuation: $3.0M
Link confidence: 100%
Open recordMarch 17, 2026
TABS2026015219
2026
Mar 17
7 days ago
March 17, 2026
TABS2026015153
2026
Mar 30
6 days from now
Construction Start
TDLR Project • Projected start
Work itemNewmark
Start Mar 30, 2026→End Jun 30, 2026
March 30, 2026
TABS2026011737
2026
Apr 20
27 days from now
Construction Start
TDLR Project • Projected start
Work itemBKV
Start Apr 20, 2026→End Jul 6, 2026
April 20, 2026
TABS2026015153
2026
May 18
2 mos from now
Construction Start
TDLR Project • Projected start
Work itemGRSM Houston Relocation
Start May 18, 2026→End Sep 25, 2026
May 18, 2026
TABS2026015219
2026
Jun 30
3 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemNewmark
Start Mar 30, 2026→End Jun 30, 2026
June 30, 2026
TABS2026011737
2026
Jul 6
3 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemBKV
Start Apr 20, 2026→End Jul 6, 2026
July 6, 2026
TABS2026015153
2026
Sep 25
6 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemGRSM Houston Relocation
Start May 18, 2026→End Sep 25, 2026
September 25, 2026
TABS2026015219
2026
Oct 31
7 mos from now
Expected Completion
TDLR Project • Projected completion
Work itemRothschild & Co
Start Mar 9, 2026→End Oct 31, 2026
October 31, 2026
TABS2026014231
Linked records by source
TDLR Projects (21)
(source: tabs_projects)PRIDE- SIMULATOR LEVEL 35
Project Closed • Feb 9, 2010
EABPRJB0806642
Description: Reduce server room to incorporate simulator room. Convert data center to general office space.
Facility: SAN FELIPE PLAZA
Design firm: ZIEGLER COOPER ARCHITECTS
Estimated cost: $170K
E1CORPORATION
Project Closed • May 7, 2015
EABPRJB5815387
Description: Renovation
Facility: SAN FELIPE PLAZA
Design firm: ZIEGLER COOPER ARCHITECTS
Estimated cost: $75K
Ensco 33, 35, 38, & 39
Project Closed • Aug 5, 2019
TABS2019017680
Description: Demo Walls for new Drilling Sim. Suite; Demo Walls for new workstations
Facility: San Felipe Tower
Design firm: Abel Design Group
Estimated cost: $300K
Sq Ft: 5,137
ELEVATOR LOBBY, CORRIDORS, AND RESTROOMS - LEVEL 20
Project Closed • Apr 15, 2020
TABS2020015648
Description: Renovation to existing elevator lobby, corridor, and restrooms.
Facility: San Felipe Plaza
Estimated cost: $220K
Sq Ft: 3,100
ELEVATOR LOBBY & CORRIDORS - LEVEL 15
Project Closed • Apr 15, 2020
TABS2020015641
Description: Renovation of existing elevator lobby and corridor.
Facility: San Felipe Plaza
Estimated cost: $100K
Sq Ft: 1,622
Ready Right Away
Project Registered • Oct 7, 2021
TABS2022002611
Description: Interior renovation of existing interior buildout
Facility: San Felipe Plaza
Design firm: Ziegler Cooper Architects
Estimated cost: $475K
Sq Ft: 8,795
Recru
Project Closed • Oct 14, 2022
TABS2023003237
Description: Interior Renovation of Existing Interior Buildout
Facility: San Felipe Plaza
Design firm: Ziegler Cooper Architects
Estimated cost: $180K
Sq Ft: 2,444
Partners Real Estate
Project Closed • Sep 27, 2024
TABS2025001969
Description: Interior renovation of 7,500sf of level 12 and all of level 14. Level 14 includes the elevator lobby but excludes the RR.
Facility: San Felipe Plaza
Design firm: Inventure
Estimated cost: $2.5M
Sq Ft: 26,953
First American Title
Review Complete • Jan 22, 2025
TABS2025010125
Description: INTERIOR RENOVATION OF EXISTING INTERIOR BUILDOUT
Facility: San Felipe Plaza
Design firm: ZIEGLER COOPER ARCHITECTS
Estimated cost: $550K
Sq Ft: 6,700
Partners Real Estate Expansion
Review Complete • Feb 18, 2025
TABS2025012223
Description: Renovation of 1,277sf. of the 12th floor to accommodate an office expansion along with an interconnecting stair to the 14th floor (the building does not have a 13th floor). Elevator lobby and restrooms are excluded.
Facility: San Felipe Plaza
Design firm: Inventure
Estimated cost: $64K
Sq Ft: 1,417
Gallagher
Review Complete • Feb 28, 2025
TABS2025013086
Description: renovation to existing interior buildout
Facility: San Felipe Plaza
Design firm: Ziegler Cooper Architects
Estimated cost: $1.5M
Sq Ft: 34,870
STRAKE FOUNDATION
Review Complete • May 20, 2025
TABS2025019414
Description: INTERIOR RENOVATION OF EXISTING INTERIOR BUILDOUT
Facility: SAN FELIPE PLAZA
Design firm: Ziegler Cooper
Estimated cost: $100K
Sq Ft: 1,699
Spec Suite
Project Closed • Jun 5, 2025
TABS2025020582
Description: Renovation to existing interior buildout.
Facility: San Felipe Plaza
Design firm: Ziegler Cooper Architects
Estimated cost: $190K
Sq Ft: 4,600
CLEAR TRAIL ADVISORS
Review Complete • Aug 7, 2025
TABS2025025397
Description: INTERIOR RENOVATION OF EXISTING INTERIOR BUILDOUT
Facility: SAN FELIPE PLAZA
Design firm: Ziegler Cooper
Estimated cost: $170K
Sq Ft: 3,353
Josephson Dunlap
Review Complete • Aug 29, 2025
TABS2025027087
Description: interior renovation to existing interior buildout with new common corridor
Facility: San Felipe Plaza
Design firm: Ziegler Cooper Architects
Estimated cost: $1.0M
Sq Ft: 10,010
Spec Suite 2450 and Building Corridor
Review Complete • Sep 10, 2025
TABS2026000598
Description: Renovation of existing lease space and building corridor
Facility: San Felipe Plaza
Design firm: Ziegler Cooper
Estimated cost: $150K
Sq Ft: 8,648
Deutser Remodel
Review Complete • Oct 10, 2025
TABS2026003123
Description: Interior remodel of existing suite for existing tenant.
Facility: SF Plaza
Design firm: Tramonte Design Studio
Estimated cost: $160K
Sq Ft: 624
Newmark
Project Registered • Feb 4, 2026
TABS2026011737
Description: INTERIOR RENOVATION OF EXISTING INTERIOR BUILDOUT
Facility: San Felipe Plaza
Design firm: Ziegler Cooper Architects
Estimated cost: $115K
Sq Ft: 20,374
Rothschild & Co
Project Registered • Mar 5, 2026
TABS2026014231
Description: Renovation of existing leasing space
Facility: San Felipe Plaza
Design firm: Ziegler Cooper Architects
Estimated cost: $190K
Sq Ft: 4,733
GRSM Houston Relocation
Project Registered • Mar 17, 2026
TABS2026015219
Description: Full interior renovation of office space. Including restroom and full buildout.
Facility: 5847 San Felipe
Design firm: Corgan
Estimated cost: $3.0M
Sq Ft: 19,200
BKV
Project Registered • Mar 17, 2026
TABS2026015153
Description: Renovation of existing lease space
Facility: San Felipe Plaza
Design firm: Ziegler Cooper Architects
Estimated cost: $250K
Sq Ft: 9,253
Explore Related Projects
Quick Actions
Companies & Contacts
🏢
Owner
SF Plaza LLC
🏢
Owner
THOMAS PROPERTIES GROUP
🏢
Design firm
ZIEGLER COOPER ARCHITECTS
🏢
Owner
SHANE CAWOOD
🏢
Owner
Valaris
🏢
Design firm
Abel Design Group
🏢
Owner
Parkway Properties
🏢
Owner
PKY San Felipe Plaza LP
🏢
Owner
San Felipe Plaza LP
🏢
Design firm
Inventure
🏢
Owner
Sovereign Partners
🏢
Design firm
Ziegler Cooper
🏢
Design firm
Tramonte Design Studio
🏢
Design firm
Corgan
Explore Area
Project metadata
- First activity
- February 9, 2010
- Last activity
- March 17, 2026