Josephson Dunlap is a renovation/alteration project at 5847 San Felipe Street Level 24, Suite 2400, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $1.0M across about 10,010 sq ft.
Final inspection completed, awaiting project closure
Josephson Dunlap is a Renovation/Alteration project located at 5847 San Felipe Street Level 24, Suite 2400, Houston, TX 77057 in Houston, Texas. The project has an estimated value of $1.0M covering 10,010 sq ft. SF Plaza LLC is the property owner and Ziegler Cooper Architects is the design firm of record. The project was registered with TDLR on August 29, 2025.
Josephson Dunlap is a renovation/alteration project at 5847 San Felipe Street Level 24, Suite 2400 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior renovation to existing interior buildout with new common corridor
Construction on Josephson Dunlap is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Josephson Dunlap is located at 5847 San Felipe Street Level 24, Suite 2400, Houston, TX, 77057, in Harris County.
SF Plaza LLC is the property owner/developer of record for Josephson Dunlap, per its TDLR project registration.
Ziegler Cooper Architects is the design firm of record for Josephson Dunlap, according to its TDLR filing.
Josephson Dunlap has an estimated construction value of $1.0M and approximately 10,010 square feet (about $100/sqft), based on its TDLR filing.
interior renovation to existing interior buildout with new common corridor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 29, 2025
Review Complete
Aug 29, 2025
Inspection Complete
Jun 20, 2026
Closed
295d
Construction phase