PORT OF ORANGE ALABAMA ST WIDENING PROJECT Increase width of drainage crossing, replace and install new box culverts under Alabama Street and replace railroad trestle at the drainage crossing to accommodate increased drainage capacity
Type of Work: Port Infrastructure
Highway: ALABAMA
Location: ALABAMA STREET DRAINAGE CROSSING to .
County: Orange
Working Days: 180.0
Oversight: State
Spec Book Year: 2024.0
$1.60M
Engineer's estimate / low bid estimate from TxDOT