For the construction of 1.75-miles of 5-foot-wide sidewalks along 5th Ave from W Walnut to W 15th St, along W 15th St from 5th Ave to Commercial, and along Commercial from W Walnut St to E Live Oak St. ADA ramps, new pvmt mrks, safety lighting.
Type of Work: Construct Pedestrian Infrastructure
Highway: Various
Location: Various locations in City of Colema to .
County: Coleman
Working Days: 193.0
Oversight: State
Spec Book Year: 2024.0
$2.54M
Engineer's estimate / low bid estimate from TxDOT
Brown Highway Edge Protection
BRIDGE AND CONCRETE REPAIR (CALLOUT)
FM765 MCCULLOCH C/L TO FM45 FY27 SC
SH36 1.87M N OF FM1702 TO .4 S OF FM1702
SH206 FM2707 TO PECAN BAYOU FY27 MILL&SC
Blake Stembridge
TxDOT - Brownwood District
🏛️ State Agency
Brown, TX
Agency #txdot_brownwood
View agency profile →View all TxDOT - Brownwood District bids →View the official TxDOT project data
View on data.texas.gov