Description: This project involves mill and overlay of 2,503 SY, 968 SY of concrete demolition and removal, 1,526 SY of sidewalk, 14 Type 1 ADA Ramps, 4 Type 8 ADA Ramps, handicap ramp with a drainage flume, 5 light pole assemblies, and 2 fire hydrants.