Electrical Permit - Remodel
Revision to 2022-042015 PR. Remodel to existing movie theater. Work to be split into 3 phases in order for the theater to remain in operation. No main means of egress in the building to be blocked. No work to be done to Lobby Restroom or Concessions. Phase 3 - 13702 SF Overall project remodel 49471 SqFt. Theatres included: 2 3 4 5 and 6. No Mechanical or Plumbing work included in Phase 3. Electrical work included.