#2023-162351 BP
Building Permit - New
📋 Project Description
NOTE: 1.24.24 - Applicant has an Exemption in process for review DA-2023-155631 which has been denied. Applicant has not been authorized to construct permanent structures on the property. Exemption or other process must be completed first. 30ft dome 706SF max occupancy with two exits 47 with one exit less than ten occupants. 3103.5 Use period. Temporary tents air-supported air-inflated or tensioned membrane structures shall not be erected for a period of more than 180 days within a 12-month period on a single premises. 3103.7 Inspections. The entire tent air-supported air-inflated or tensioned membrane structure system shall be inspected at regular intervals but not less than two times per permit use period by the permittee owner or agent to determine that the installation is maintained in accordance with this chapter. Exception: Permit use periods of less than 30 days.
📍 Project Location
Austin
Austin, TX 78701