Electrical Permit - Upgrade
Relocating service meter with a new 3 conduit into customers utility pull box. and main service disconnects to the exterior of an addition. The existing main service panels will remain in their current location and be refed from 2 new 200-amp transfer switches that will serve as the new service disconnects. We are also adding a new 26KW generator. In the ETJ.
8 CHEVERLY CT, Austin, TX