ACC BUILDING 3000 ADAPTIVE REUSE
ACC BUILDING 3000 ADAPTIVE REUSE is a addition / renovation project at 1218 WEST AVENUE, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2010). The project has an estimated value of $7.7M.
๐Project Metrics
TDLR #EABPRJA9802055Project Closed
Project has been completed and closed
ACC BUILDING 3000 ADAPTIVE REUSE is a Addition / Renovation project located at 1218 WEST AVENUE, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $7.7M. AUSTIN COMMUNITY COLLEGE is the property owner and BLGY is the design firm of record. The project was registered with TDLR on October 7, 2008.
โFrequently Asked Questions
What is ACC BUILDING 3000 ADAPTIVE REUSE?
ACC BUILDING 3000 ADAPTIVE REUSE is a addition / renovation project at 1218 WEST AVENUE in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: remodel and addition for a 1930โs gym on the downtown ACC campus - final gross interior area of the project is 3
Is ACC BUILDING 3000 ADAPTIVE REUSE open in Austin?
Construction on ACC BUILDING 3000 ADAPTIVE REUSE is complete โ TDLR records show the project passed its required accessibility inspection in May 2010. The building is finished and very likely open.
Where is ACC BUILDING 3000 ADAPTIVE REUSE located?
ACC BUILDING 3000 ADAPTIVE REUSE is located at 1218 WEST AVENUE, Austin, TX, 78701, in Travis County.
Who is the owner or developer of ACC BUILDING 3000 ADAPTIVE REUSE?
AUSTIN COMMUNITY COLLEGE is the property owner/developer of record for ACC BUILDING 3000 ADAPTIVE REUSE, per its TDLR project registration.
Who is the architect or design firm for ACC BUILDING 3000 ADAPTIVE REUSE?
BLGY is the design firm of record for ACC BUILDING 3000 ADAPTIVE REUSE, according to its TDLR filing.
How much does ACC BUILDING 3000 ADAPTIVE REUSE cost and how big is it?
ACC BUILDING 3000 ADAPTIVE REUSE has an estimated construction value of $7.7M, based on its TDLR filing.
๐Scope of Work
remodel and addition for a 1930โs gym on the downtown ACC campus - final gross interior area of the project is 3
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 7, 2008
Review Complete
Inspection Complete
Closed
May 1, 2010
๐Related Projects
๐คSame Owner
$453.0M total๐Related City Permits
Building permits found at or near this location
Free standing shed less than 200 sq ft with general-purpose receptacles lights and a 220 amp mini split
60a Tesla wall connector installation
200-amp meter and panel upgrade
New 2-story single family residence 4 bed/3.5 bath attached garage covered patio and porch water service by well and septic for WW.
New 2-story single family residence 4 bed/3.5 bath attached garage covered patio and porch water service by well and septic for WW.