H&R BLOCK
H&R BLOCK is a renovation/alteration project at 9500 IH-35 Building L, Suite 700, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2008). The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJA9803901Project Closed
Project has been completed and closed
H&R BLOCK is a Renovation/Alteration project located at 9500 IH-35 Building L, Suite 700, Austin, TX 75080 in Austin, Texas. The project has an estimated value of $80K. INLAND WESTERN AUSTIN SOUTHPARK MEADOWS is the property owner and LAWRENCE GROUP, THE is the design firm of record. The project was registered with TDLR on November 10, 2008.
โFrequently Asked Questions
What is H&R BLOCK?
H&R BLOCK is a renovation/alteration project at 9500 IH-35 Building L, Suite 700 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: First time tenant finish out in a new shell building.
Is H&R BLOCK open in Austin?
Construction on H&R BLOCK is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2008. The building is finished and very likely open.
Where is H&R BLOCK located?
H&R BLOCK is located at 9500 IH-35 Building L, Suite 700, Austin, TX, 75080, in Travis County.
Who is the owner or developer of H&R BLOCK?
INLAND WESTERN AUSTIN SOUTHPARK MEADOWS is the property owner/developer of record for H&R BLOCK, per its TDLR project registration.
Who is the architect or design firm for H&R BLOCK?
LAWRENCE GROUP, THE is the design firm of record for H&R BLOCK, according to its TDLR filing.
How much does H&R BLOCK cost and how big is it?
H&R BLOCK has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
First time tenant finish out in a new shell building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 10, 2008
Review Complete
Inspection Complete
Closed
Dec 1, 2008
๐Related Projects
๐คSame Owner
$330K total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 203
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 531
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 512
Replacement of an existing water heater 50gal electric tank
*Green Building* New 1-story 4 bedroom 3.5 bathroom single family residence with attached garage covered front porch and rear covered patio.