Construction complete ยท Feb 2009๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

DILLARD'S EAST

2901 CAPITOL OF TEXAS HIGHWAY, Austin, TX 78746, Austin, TX, 78746

DILLARD'S EAST is a renovation/alteration project at 2901 CAPITOL OF TEXAS HIGHWAY, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2009). The project has an estimated value of $84K.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJA9803961
$84K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
2 months
Duration
Registered:Nov 11, 2008
Start:Dec 1, 2008
Target:Feb 1, 2009
๐Ÿ

Project Closed

Project has been completed and closed

DILLARD'S EAST is a Renovation/Alteration project located at 2901 CAPITOL OF TEXAS HIGHWAY, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $84K. DILLARD'S DEPARTMENT STORES is the property owner and ARCHITECTURE + is the design firm of record. The project was registered with TDLR on November 11, 2008.

โ“Frequently Asked Questions

What is DILLARD'S EAST?

DILLARD'S EAST is a renovation/alteration project at 2901 CAPITOL OF TEXAS HIGHWAY in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Partial remodel of existing department store.

Is DILLARD'S EAST open in Austin?

Construction on DILLARD'S EAST is complete โ€” TDLR records show the project passed its required accessibility inspection in Feb 2009. The building is finished and very likely open.

Where is DILLARD'S EAST located?

DILLARD'S EAST is located at 2901 CAPITOL OF TEXAS HIGHWAY, Austin, TX, 78746, in Travis County.

Who is the owner or developer of DILLARD'S EAST?

DILLARD'S DEPARTMENT STORES is the property owner/developer of record for DILLARD'S EAST, per its TDLR project registration.

Who is the architect or design firm for DILLARD'S EAST?

ARCHITECTURE + is the design firm of record for DILLARD'S EAST, according to its TDLR filing.

How much does DILLARD'S EAST cost and how big is it?

DILLARD'S EAST has an estimated construction value of $84K, based on its TDLR filing.

๐Ÿ“‹Scope of Work

Partial remodel of existing department store.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
November 11, 2008
Project Closed
February 1, 2009
Construction Start
December 1, 2008
Expected Completion
February 1, 2009

๐Ÿ“…Project Timeline

Filed

Nov 11, 2008

Review Complete

Inspection Complete

Closed

Feb 1, 2009

๐Ÿ“Location & Views

Open in MapsGet Directions|30.32757, -97.81091

๐Ÿ“„Related City Permits

Building permits found at or near this location

2901 CHERRY LN
3.29 mi away

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.

ActiveMechanical PermitChange OutJun 2026
View Details
2026-079269 MP
๐Ÿ”งRadiant Plumbing and Air Conditioning
2901 S CAPITAL OF TEXAS HWY NB
4.82 mi away

Per Austin Water we will be installing a backflow prevention device not an RPZ. The installation location in in the dock area near Scarborough and AMC Theaters

ActivePlumbing PermitRepairJun 2026
View Details
2026-075970 PP
๐Ÿ”งTouchstone Plumbing Inc.
2901 S CAPITAL OF TEXAS HWY NB BLDG MO2A
4.82 mi away

Retrofit of an existing tenant fit out. Work includes new and relocated sales floor fixtures floor finish replacement and minor electrical work. Existing Sephora.

ActiveBuilding PermitRemodelJun 2026
View Details
2026-071827 BP
๐Ÿ”งApex Imaging Services
2901 S CAPITAL OF TEXAS HWY NB
4.82 mi away

In order to install two new customer provided 2500 gallon grease traps a 12 x 10 area of concrete will be removed. This area will be excavated up to 12 in depth. The new grease traps will be installed per manufacture requirements and inspected by the City of Austin. The system will be connected to the existing inlet and outlet piping. Once the new system is in use the existing trap will be pumped cleaned and filled in with pea gravel and topped with concrete.

ActivePlumbing PermitGrease Interceptor (GI) replacementJun 2026
View Details
2026-064529 PP
๐Ÿ”งLas Colinas Plumbing
2901 N IH 35 SVRD NB

Individual front lit channel letters reading TJ Maxx on west elevation

ActiveElectrical PermitWallJun 2026
View Details
2026-074289 EP

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists