GREATER TEXAS CENTER
GREATER TEXAS CENTER is a new construction project at 11401 HIGHWAY 290 E., Manor, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2009). The project has an estimated value of $750K.
๐Project Metrics
TDLR #EABPRJA9808790Project Closed
Project has been completed and closed
GREATER TEXAS CENTER is a New Construction project located at 11401 HIGHWAY 290 E., Manor, TX 78653 in Manor, Texas. The project has an estimated value of $750K. MANOR VILLAGE CONDOMINIUMS LTD. is the property owner and CHUCK KRUEGER ARCHITECT is the design firm of record. The project was registered with TDLR on February 26, 2009.
โFrequently Asked Questions
What is GREATER TEXAS CENTER?
GREATER TEXAS CENTER is a new construction project at 11401 HIGHWAY 290 E. in Manor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 5,000 sq. ft. United States Postal Facility
Is GREATER TEXAS CENTER open in Manor?
Construction on GREATER TEXAS CENTER is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2009. The building is finished and very likely open.
Where is GREATER TEXAS CENTER located?
GREATER TEXAS CENTER is located at 11401 HIGHWAY 290 E., Manor, TX, 78653, in Travis County.
Who is the owner or developer of GREATER TEXAS CENTER?
MANOR VILLAGE CONDOMINIUMS LTD. is the property owner/developer of record for GREATER TEXAS CENTER, per its TDLR project registration.
Who is the architect or design firm for GREATER TEXAS CENTER?
CHUCK KRUEGER ARCHITECT is the design firm of record for GREATER TEXAS CENTER, according to its TDLR filing.
How much does GREATER TEXAS CENTER cost and how big is it?
GREATER TEXAS CENTER has an estimated construction value of $750K, based on its TDLR filing.
๐Scope of Work
5,000 sq. ft. United States Postal Facility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 26, 2009
Review Complete
Inspection Complete
Closed
Aug 1, 2009
๐Related Projects
๐๏ธSame Design Firm
$2.5M total๐Related City Permits
Building permits found at or near this location
Add 2 20a 120v outlets tying into common outlet circuit in that area (panel h4lp3 circuit 13). These outlets are added for change of desk lay out and a small printer. Note for the inspector. Check for an updated panel schedule.
Upgrade existing electrical service from 200A to 400A. PEC metering has already approved the CT upgrade. Upgraded service to provide power to two existing structures: the shop and the home. Both the shop and the home will have their own 200A main electric panels. Upgraded meter can to replace existing 200A meter can on southwest corner of shop. Includes trench from shop to house to feed main panel at house.
Repair a PVC belly by way of a tunnel from the clean-out in the front yard 17ft under the foundation.
Replacement of an existing water heater 40 Gallon Nat Gas Water Heater Replacement
Evelyn - secondary monument
Property Owner
Design Firm
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis