HARRIS CONNECT
HARRIS CONNECT is a renovation/alteration project at BLDG C, STE 110, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2009). The project has an estimated value of $138K.
๐Project Metrics
TDLR #EABPRJA9810447Project Closed
Project has been completed and closed
HARRIS CONNECT is a Renovation/Alteration project located at BLDG C, STE 110, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $138K. HPI REAL ESTATE SERVICES is the property owner and KAMPFE DE STIJL is the design firm of record. The project was registered with TDLR on April 2, 2009.
โFrequently Asked Questions
What is HARRIS CONNECT?
HARRIS CONNECT is a renovation/alteration project at BLDG C, STE 110 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4.1.6 Interior remodel of existing lease space
Is HARRIS CONNECT open in Austin?
Construction on HARRIS CONNECT is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2009. The building is finished and very likely open.
Where is HARRIS CONNECT located?
HARRIS CONNECT is located at BLDG C, STE 110, Austin, TX, 78758, in Travis County.
Who is the owner or developer of HARRIS CONNECT?
HPI REAL ESTATE SERVICES is the property owner/developer of record for HARRIS CONNECT, per its TDLR project registration.
Who is the architect or design firm for HARRIS CONNECT?
KAMPFE DE STIJL is the design firm of record for HARRIS CONNECT, according to its TDLR filing.
How much does HARRIS CONNECT cost and how big is it?
HARRIS CONNECT has an estimated construction value of $138K, based on its TDLR filing.
๐Scope of Work
4.1.6 Interior remodel of existing lease space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 2, 2009
Review Complete
Inspection Complete
Closed
Jun 1, 2009
๐Related Projects
๐คSame Owner
$1.9M total๐๏ธSame Design Firm
$100.6M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater
Replacement of an existing water heater This estimate includes all cost necessary to remove and dispose of the existing water heating unit and replace with a new 40 gallon natural gas heater with all code upgrades and new connections. Also installing a PRV
Panel upgrade and deletion of indoor panel
In ground swimming pool w/required enclosure device for existing SFR.
Upgrade main underground service and meter and replace sub panel.
Property Owner
Design Firm
Location Intelligence
Active businesses near this construction site
Business data from Google