VENTURA FOODS
VENTURA FOODS is a additions to existing building project at 1100 DEFIEL DRIVE, Saginaw, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2010). The project has an estimated value of $4.2M.
๐Project Metrics
TDLR #EABPRJA9811369Project Closed
Project has been completed and closed
VENTURA FOODS is a Additions to Existing Building project located at 1100 DEFIEL DRIVE, Saginaw, TX 76179 in Saginaw, Texas. The project has an estimated value of $4.2M. VENTURA FOODS LLC is the property owner and NEEDHAM CONSULTING ENGINEERS is the design firm of record. The project was registered with TDLR on April 24, 2009.
โFrequently Asked Questions
What is VENTURA FOODS?
VENTURA FOODS is a additions to existing building project at 1100 DEFIEL DRIVE in Saginaw, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Add Warehouse space along bathroom and break room to existing building
Is VENTURA FOODS open in Saginaw?
Construction on VENTURA FOODS is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2010. The building is finished and very likely open.
Where is VENTURA FOODS located?
VENTURA FOODS is located at 1100 DEFIEL DRIVE, Saginaw, TX, 76179, in Tarrant County.
Who is the owner or developer of VENTURA FOODS?
VENTURA FOODS LLC is the property owner/developer of record for VENTURA FOODS, per its TDLR project registration.
Who is the architect or design firm for VENTURA FOODS?
NEEDHAM CONSULTING ENGINEERS is the design firm of record for VENTURA FOODS, according to its TDLR filing.
How much does VENTURA FOODS cost and how big is it?
VENTURA FOODS has an estimated construction value of $4.2M, based on its TDLR filing.
๐Scope of Work
Add Warehouse space along bathroom and break room to existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 24, 2009
Review Complete
Inspection Complete
Closed
Nov 1, 2010