SUBWAY
SUBWAY is a new construction project at 11643 SE LOOP 410, SUITE 121, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2009). The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJA9815790Project Closed
Project has been completed and closed
SUBWAY is a New Construction project located at 11643 SE LOOP 410, SUITE 121, San Antonio, TX 78214 in San Antonio, Texas. The project has an estimated value of $80K. ROHDE REALTY is the property owner and HARMON DRAFTING & DESIGN is the design firm of record. The project was registered with TDLR on August 3, 2009.
โFrequently Asked Questions
What is SUBWAY?
SUBWAY is a new construction project at 11643 SE LOOP 410, SUITE 121 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: framing, insulation, drywall, ceiling grid, wallcovering, paint, ceramic tile, plumbing, sprinklers, mechanical,
Is SUBWAY open in San Antonio?
Construction on SUBWAY is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2009. The building is finished and very likely open.
Where is SUBWAY located?
SUBWAY is located at 11643 SE LOOP 410, SUITE 121, San Antonio, TX, 78214, in Bexar County.
Who is the owner or developer of SUBWAY?
ROHDE REALTY is the property owner/developer of record for SUBWAY, per its TDLR project registration.
Who is the architect or design firm for SUBWAY?
HARMON DRAFTING & DESIGN is the design firm of record for SUBWAY, according to its TDLR filing.
How much does SUBWAY cost and how big is it?
SUBWAY has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
framing, insulation, drywall, ceiling grid, wallcovering, paint, ceramic tile, plumbing, sprinklers, mechanical,
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 3, 2009
Review Complete
Inspection Complete
Closed
Dec 1, 2009
๐Related Projects
๐คSame Owner
$2.8M total๐๏ธSame Design Firm
$885K totalProperty Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Bexar County
Find General Contractors in Bexar