DENTURE AND DENTAL is a renovation/alteration project at 1103 RIVERY BEND Suite 300, Georgetown, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2011). The project has an estimated value of $288K.
๐Project Metrics
TDLR #EABPRJA9816562Project Closed
Project has been completed and closed
DENTURE AND DENTAL is a Renovation/Alteration project located at 1103 RIVERY BEND Suite 300, Georgetown, TX 78628 in Georgetown, Texas. The project has an estimated value of $288K. INLAND WESTERN is the property owner and DANNY R MITCHELL ARCHITECT P.C. is the design firm of record. The project was registered with TDLR on August 20, 2009.
โFrequently Asked Questions
What is DENTURE AND DENTAL?
DENTURE AND DENTAL is a renovation/alteration project at 1103 RIVERY BEND Suite 300 in Georgetown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finish for Dental office
Is DENTURE AND DENTAL open in Georgetown?
Construction on DENTURE AND DENTAL is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2011. The building is finished and very likely open.
Where is DENTURE AND DENTAL located?
DENTURE AND DENTAL is located at 1103 RIVERY BEND Suite 300, Georgetown, TX, 78628, in Williamson County.
Who is the owner or developer of DENTURE AND DENTAL?
INLAND WESTERN is the property owner/developer of record for DENTURE AND DENTAL, per its TDLR project registration.
Who is the architect or design firm for DENTURE AND DENTAL?
DANNY R MITCHELL ARCHITECT P.C. is the design firm of record for DENTURE AND DENTAL, according to its TDLR filing.
How much does DENTURE AND DENTAL cost and how big is it?
DENTURE AND DENTAL has an estimated construction value of $288K, based on its TDLR filing.
๐Scope of Work
Tenant finish for Dental office
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 20, 2009
Review Complete
Inspection Complete
Closed
Mar 15, 2011
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Water heater change out 1103 Apollo Drive Austin TX 78758
Installing existing panels (8.75 kW DC) from a previous installation on the rooftop of the existing residential home. In addition installing a new 11.5 kW AC inverter integrated with energy storage of 13.5 kW. The previous inverter installed is unknown.
Request to disconnect 200A main breaker to install new 200A transfer switch for energy storage installation. No meter can replacment required.
Installation of 42.275 kW roof mounted solar system + 2 PW3s + 1 PW3 Expansion Pack
Replacement of an existing water heater Water heater change out 11032 Desert Willow Loop Austin TX 78748
Property Owner
Design Firm
Location Intelligence
Active businesses near this construction site
Business data from Google