COLONIAL SAVINGS
COLONIAL SAVINGS is a renovation/alteration project at 12222 MERIT DRIVE Suite 900, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2009). The project has an estimated value of $65K.
๐Project Metrics
TDLR #EABPRJA9816925Project Closed
Project has been completed and closed
COLONIAL SAVINGS is a Renovation/Alteration project located at 12222 MERIT DRIVE Suite 900, Dallas, TX 75251 in Dallas, Texas. The project has an estimated value of $65K. YOUNAN PROPERTIES is the property owner and OPTIMAL SPACE DESIGNS LLC. is the design firm of record. The project was registered with TDLR on August 31, 2009.
โFrequently Asked Questions
What is COLONIAL SAVINGS?
COLONIAL SAVINGS is a renovation/alteration project at 12222 MERIT DRIVE Suite 900 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of Tenant Space
Is COLONIAL SAVINGS open in Dallas?
Construction on COLONIAL SAVINGS is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2009. The building is finished and very likely open.
Where is COLONIAL SAVINGS located?
COLONIAL SAVINGS is located at 12222 MERIT DRIVE Suite 900, Dallas, TX, 75251, in Dallas County.
Who is the owner or developer of COLONIAL SAVINGS?
YOUNAN PROPERTIES is the property owner/developer of record for COLONIAL SAVINGS, per its TDLR project registration.
Who is the architect or design firm for COLONIAL SAVINGS?
OPTIMAL SPACE DESIGNS LLC. is the design firm of record for COLONIAL SAVINGS, according to its TDLR filing.
How much does COLONIAL SAVINGS cost and how big is it?
COLONIAL SAVINGS has an estimated construction value of $65K, based on its TDLR filing.
๐Scope of Work
Renovation of Tenant Space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 31, 2009
Review Complete
Inspection Complete
Closed
Dec 1, 2009