STATE LEASE #20229 - TWDB
STATE LEASE #20229 - TWDB is a unknown project at 211 EAST 7TH STREET STE 920, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2009).
๐Project Metrics
TDLR #EABPRJB0000571Project Closed
Project has been completed and closed
STATE LEASE #20229 - TWDB is a Unknown project located at 211 EAST 7TH STREET STE 920, Austin, TX 78701 in Austin, Texas.. HIGHLAND RESOURCES INC is the property owner. The project was registered with TDLR on October 6, 2009.
โFrequently Asked Questions
What is STATE LEASE #20229 - TWDB?
STATE LEASE #20229 - TWDB is a unknown project at 211 EAST 7TH STREET STE 920 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: LEASE PERIOD 09012009 THRU 083120133,728 SFT
Is STATE LEASE #20229 - TWDB open in Austin?
Construction on STATE LEASE #20229 - TWDB is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2009. The building is finished and very likely open.
Where is STATE LEASE #20229 - TWDB located?
STATE LEASE #20229 - TWDB is located at 211 EAST 7TH STREET STE 920, Austin, TX, 78701, in Travis County.
Who is the owner or developer of STATE LEASE #20229 - TWDB?
HIGHLAND RESOURCES INC is the property owner/developer of record for STATE LEASE #20229 - TWDB, per its TDLR project registration.
๐Scope of Work
LEASE PERIOD 09012009 THRU 083120133,728 SFT
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 6, 2009
Review Complete
Inspection Complete
Closed
Sep 1, 2009
๐Related Projects
๐Related City Permits
Building permits found at or near this location
upgrade overhead service to 200 amp. Install new Austin Energy approved single phase 200 amp meter enclosure. Install 200 amp ATS as main breaker for future generator. Install new MLO sub panel. All branch circuits to remain as existing no new loads.
Replacement of complete existing central heat and air system with or without duct work moore
ePlan: Residential Expedited Review - Three Unit - Bldg 1 New Construction of 2-Story SF Res [5bed 4bath] w/ attached garage
ePlan: Residential Expedited Review - Three Unit - Bldg 3 New Construction of 2-Story SF Res [3bed 2.5bath] w/ attached carport
ePlan: Residential Expedited Review - Three Unit - Bldg 2 New Construction of 2-Story SF Res [5bed 4bath] w/ attached garage