INDEPENDENCE TITLE
INDEPENDENCE TITLE is a renovation/alteration project at 901 S. MOPAC Ste 150, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2010). The project has an estimated value of $153K.
๐Project Metrics
TDLR #EABPRJB0802839Project Closed
Project has been completed and closed
INDEPENDENCE TITLE is a Renovation/Alteration project located at 901 S. MOPAC Ste 150, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $153K. HPI REAL ESTATE SERVICES is the property owner and KAMPFE DE STIJL is the design firm of record. The project was registered with TDLR on November 5, 2009.
โFrequently Asked Questions
What is INDEPENDENCE TITLE?
INDEPENDENCE TITLE is a renovation/alteration project at 901 S. MOPAC Ste 150 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4.1.6 Alteration/Renovation of existing lease space
Is INDEPENDENCE TITLE open in Austin?
Construction on INDEPENDENCE TITLE is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2010. The building is finished and very likely open.
Where is INDEPENDENCE TITLE located?
INDEPENDENCE TITLE is located at 901 S. MOPAC Ste 150, Austin, TX, 78746, in Travis County.
Who is the owner or developer of INDEPENDENCE TITLE?
HPI REAL ESTATE SERVICES is the property owner/developer of record for INDEPENDENCE TITLE, per its TDLR project registration.
Who is the architect or design firm for INDEPENDENCE TITLE?
KAMPFE DE STIJL is the design firm of record for INDEPENDENCE TITLE, according to its TDLR filing.
How much does INDEPENDENCE TITLE cost and how big is it?
INDEPENDENCE TITLE has an estimated construction value of $153K, based on its TDLR filing.
๐Scope of Work
4.1.6 Alteration/Renovation of existing lease space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 5, 2009
Review Complete
Inspection Complete
Closed
Jan 1, 2010
๐Related Projects
๐คSame Owner
$1.9M total๐๏ธSame Design Firm
$100.6M total๐Related City Permits
Building permits found at or near this location
Interior remodel to existing business office suite. No access control. No change of use.
New construction in-ground pool concrete deck and associated equipment pad.
CHANGE OF USE ADM OFFICE TO MEDICAL OFFICE with interior remodel
Verizon proposed fiber installation - boring conduit from ROW to proposed fiber vault/ building entry. No backup batteries or generator proposed.
Non structural interior office remodel. Original QT had been withdrawn to resubmit as a 7 Day to include Fire and Electric.