JLAFF
JLAFF is a renovation/alteration project at 1800 POST OAK BOULEVARD, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2010). The project has an estimated value of $550K.
๐Project Metrics
TDLR #EABPRJB0813871Project Closed
Project has been completed and closed
JLAFF is a Renovation/Alteration project located at 1800 POST OAK BOULEVARD, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $550K. BOULEVARD PLACE L.P. is the property owner and ABEL DESIGN GROUP is the design firm of record. The project was registered with TDLR on July 14, 2010.
โFrequently Asked Questions
What is JLAFF?
JLAFF is a renovation/alteration project at 1800 POST OAK BOULEVARD in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior buildout of slab space on 3rd floor of buildingto include offices, conference rooms, and break area.
Is JLAFF open in Houston?
Construction on JLAFF is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2010. The building is finished and very likely open.
Where is JLAFF located?
JLAFF is located at 1800 POST OAK BOULEVARD, Houston, TX, 77056, in Harris County.
Who is the owner or developer of JLAFF?
BOULEVARD PLACE L.P. is the property owner/developer of record for JLAFF, per its TDLR project registration.
Who is the architect or design firm for JLAFF?
ABEL DESIGN GROUP is the design firm of record for JLAFF, according to its TDLR filing.
How much does JLAFF cost and how big is it?
JLAFF has an estimated construction value of $550K, based on its TDLR filing.
๐Scope of Work
Interior buildout of slab space on 3rd floor of buildingto include offices, conference rooms, and break area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 14, 2010
Review Complete
Inspection Complete
Closed
Oct 1, 2010