SPEEDY STOP # 8
SPEEDY STOP # 8 is a additions to existing building project at 3601 JOHN STOCKBAUER, Victoria, in Victoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2011). The project has an estimated value of $210K.
๐Project Metrics
TDLR #EABPRJB1805515Project Closed
Project has been completed and closed
SPEEDY STOP # 8 is a Additions to Existing Building project located at 3601 JOHN STOCKBAUER, Victoria, TX 77904 in Victoria, Texas. The project has an estimated value of $210K. SPEEDY STOP FOOD STORES LLC is the property owner and 4 1 DESIGNS is the design firm of record. The project was registered with TDLR on January 4, 2011.
โFrequently Asked Questions
What is SPEEDY STOP # 8?
SPEEDY STOP # 8 is a additions to existing building project at 3601 JOHN STOCKBAUER in Victoria, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Front elevation, taco kitchen and add on storage and refrigeration.
Is SPEEDY STOP # 8 open in Victoria?
Construction on SPEEDY STOP # 8 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2011. The building is finished and very likely open.
Where is SPEEDY STOP # 8 located?
SPEEDY STOP # 8 is located at 3601 JOHN STOCKBAUER, Victoria, TX, 77904, in Victoria County.
Who is the owner or developer of SPEEDY STOP # 8?
SPEEDY STOP FOOD STORES LLC is the property owner/developer of record for SPEEDY STOP # 8, per its TDLR project registration.
Who is the architect or design firm for SPEEDY STOP # 8?
4 1 DESIGNS is the design firm of record for SPEEDY STOP # 8, according to its TDLR filing.
How much does SPEEDY STOP # 8 cost and how big is it?
SPEEDY STOP # 8 has an estimated construction value of $210K, based on its TDLR filing.
๐Scope of Work
Front elevation, taco kitchen and add on storage and refrigeration.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 4, 2011
Review Complete
Inspection Complete
Closed
Mar 1, 2011