JBS LOAD OUT
JBS LOAD OUT is a new construction project at HIGHWAY 287 NORTH, Cactus, in Moore County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2012). The project has an estimated value of $6.0M.
๐Project Metrics
TDLR #EABPRJB1806527Project Closed
Project has been completed and closed
JBS LOAD OUT is a New Construction project located at HIGHWAY 287 NORTH, Cactus, TX 79013 in Cactus, Texas. The project has an estimated value of $6.0M. JBS USA LLC is the property owner and GRAY CONSTRUCTION is the design firm of record. The project was registered with TDLR on January 26, 2011.
โFrequently Asked Questions
What is JBS LOAD OUT?
JBS LOAD OUT is a new construction project at HIGHWAY 287 NORTH in Cactus, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A new sales cooler, fab floor and load out to be added to an existing meat processing facility.
Is JBS LOAD OUT open in Cactus?
Construction on JBS LOAD OUT is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2012. The building is finished and very likely open.
Where is JBS LOAD OUT located?
JBS LOAD OUT is located at HIGHWAY 287 NORTH, Cactus, TX, 79013, in Moore County.
Who is the owner or developer of JBS LOAD OUT?
JBS USA LLC is the property owner/developer of record for JBS LOAD OUT, per its TDLR project registration.
Who is the architect or design firm for JBS LOAD OUT?
GRAY CONSTRUCTION is the design firm of record for JBS LOAD OUT, according to its TDLR filing.
How much does JBS LOAD OUT cost and how big is it?
JBS LOAD OUT has an estimated construction value of $6.0M, based on its TDLR filing.
๐Scope of Work
A new sales cooler, fab floor and load out to be added to an existing meat processing facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 26, 2011
Review Complete
Inspection Complete
Closed
Feb 1, 2012
๐Related Projects
๐๏ธSame Design Firm
$17.3M totalProperty Owner