O I SHI SHUSHI
O I SHI SHUSHI is a renovation/alteration project at 701 W. PARK ROW, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2011). The project has an estimated value of $60K.
๐Project Metrics
TDLR #EABPRJB1808918Project Closed
Project has been completed and closed
O I SHI SHUSHI is a Renovation/Alteration project located at 701 W. PARK ROW, Arlington, TX 76013 in Arlington, Texas. The project has an estimated value of $60K. TRIPLE 9 SANDY LAKE LP is the property owner and BRIGHT ENGINEERING is the design firm of record. The project was registered with TDLR on March 17, 2011.
โFrequently Asked Questions
What is O I SHI SHUSHI?
O I SHI SHUSHI is a renovation/alteration project at 701 W. PARK ROW in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Restrooms, dining, kitchen.
Is O I SHI SHUSHI open in Arlington?
Construction on O I SHI SHUSHI is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2011. The building is finished and very likely open.
Where is O I SHI SHUSHI located?
O I SHI SHUSHI is located at 701 W. PARK ROW, Arlington, TX, 76013, in Tarrant County.
Who is the owner or developer of O I SHI SHUSHI?
TRIPLE 9 SANDY LAKE LP is the property owner/developer of record for O I SHI SHUSHI, per its TDLR project registration.
Who is the architect or design firm for O I SHI SHUSHI?
BRIGHT ENGINEERING is the design firm of record for O I SHI SHUSHI, according to its TDLR filing.
How much does O I SHI SHUSHI cost and how big is it?
O I SHI SHUSHI has an estimated construction value of $60K, based on its TDLR filing.
๐Scope of Work
Restrooms, dining, kitchen.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 17, 2011
Review Complete
Inspection Complete
Closed
Sep 1, 2011