SPEC SUITE 100
SPEC SUITE 100 is a renovation/alteration project at 2301 SOUTHPOINT DRIVE, Lancaster, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2011). The project has an estimated value of $50K.
๐Project Metrics
TDLR #EABPRJB1810192Project Closed
Project has been completed and closed
SPEC SUITE 100 is a Renovation/Alteration project located at 2301 SOUTHPOINT DRIVE, Lancaster, TX 75134 in Lancaster, Texas. The project has an estimated value of $50K. KTR CAPITAL is the property owner and JONES COMMERCIAL INTERIORS is the design firm of record. The project was registered with TDLR on April 8, 2011.
โFrequently Asked Questions
What is SPEC SUITE 100?
SPEC SUITE 100 is a renovation/alteration project at 2301 SOUTHPOINT DRIVE in Lancaster, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Finishing out of an existing space
Is SPEC SUITE 100 open in Lancaster?
Construction on SPEC SUITE 100 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2011. The building is finished and very likely open.
Where is SPEC SUITE 100 located?
SPEC SUITE 100 is located at 2301 SOUTHPOINT DRIVE, Lancaster, TX, 75134, in Dallas County.
Who is the owner or developer of SPEC SUITE 100?
KTR CAPITAL is the property owner/developer of record for SPEC SUITE 100, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 100?
JONES COMMERCIAL INTERIORS is the design firm of record for SPEC SUITE 100, according to its TDLR filing.
How much does SPEC SUITE 100 cost and how big is it?
SPEC SUITE 100 has an estimated construction value of $50K, based on its TDLR filing.
๐Scope of Work
Finishing out of an existing space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 8, 2011
Review Complete
Inspection Complete
Closed
Jun 1, 2011