SAMSUNG SARC
SAMSUNG SARC is a renovation/alteration project at 7300 FM 2222 Bldg I, Suite 100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2011). The project has an estimated value of $2.0M.
๐Project Metrics
TDLR #EABPRJB1810926Project Closed
Project has been completed and closed
SAMSUNG SARC is a Renovation/Alteration project located at 7300 FM 2222 Bldg I, Suite 100, Austin, TX 78730 in Austin, Texas. The project has an estimated value of $2.0M. HPI is the property owner and CARSON DESIGN ASSOCIATES is the design firm of record. The project was registered with TDLR on April 22, 2011.
โFrequently Asked Questions
What is SAMSUNG SARC?
SAMSUNG SARC is a renovation/alteration project at 7300 FM 2222 Bldg I, Suite 100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1st generation tenant buildout
Is SAMSUNG SARC open in Austin?
Construction on SAMSUNG SARC is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2011. The building is finished and very likely open.
Where is SAMSUNG SARC located?
SAMSUNG SARC is located at 7300 FM 2222 Bldg I, Suite 100, Austin, TX, 78730, in Travis County.
Who is the owner or developer of SAMSUNG SARC?
HPI is the property owner/developer of record for SAMSUNG SARC, per its TDLR project registration.
Who is the architect or design firm for SAMSUNG SARC?
CARSON DESIGN ASSOCIATES is the design firm of record for SAMSUNG SARC, according to its TDLR filing.
How much does SAMSUNG SARC cost and how big is it?
SAMSUNG SARC has an estimated construction value of $2.0M, based on its TDLR filing.
๐Scope of Work
1st generation tenant buildout
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 22, 2011
Review Complete
Inspection Complete
Closed
Jul 1, 2011
๐Related Projects
๐คSame Owner
$175.9M total๐Related City Permits
Building permits found at or near this location
Request to disconnect and reconnect. TruTec will be moving PV meter over 1 ft to the right
Replace 200 Amp UG service
Express- Foundation repair. Install 24 Exterior and 13 Interior Pilings
New pool
New 2-story single family residence 3 bed/2.5 bath with attached garage covered front porch and covered rear patio Green Building