ATOS ORIGIN is a renovation/alteration project at 1650 HIGHWAY 6 SOUTH Suite 200, Sugar Land, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2011). The project has an estimated value of $235K.
๐Project Metrics
TDLR #EABPRJB1811637Project Closed
Project has been completed and closed
ATOS ORIGIN is a Renovation/Alteration project located at 1650 HIGHWAY 6 SOUTH Suite 200, Sugar Land, TX 77478 in Sugar Land, Texas. The project has an estimated value of $235K. PM REALTY GROUP is the property owner and COLLINS DESIGN GROUP is the design firm of record. The project was registered with TDLR on May 6, 2011.
โFrequently Asked Questions
What is ATOS ORIGIN?
ATOS ORIGIN is a renovation/alteration project at 1650 HIGHWAY 6 SOUTH Suite 200 in Sugar Land, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: new tenant build-out in existing lease space
Is ATOS ORIGIN open in Sugar Land?
Construction on ATOS ORIGIN is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2011. The building is finished and very likely open.
Where is ATOS ORIGIN located?
ATOS ORIGIN is located at 1650 HIGHWAY 6 SOUTH Suite 200, Sugar Land, TX, 77478, in Fort Bend County.
Who is the owner or developer of ATOS ORIGIN?
PM REALTY GROUP is the property owner/developer of record for ATOS ORIGIN, per its TDLR project registration.
Who is the architect or design firm for ATOS ORIGIN?
COLLINS DESIGN GROUP is the design firm of record for ATOS ORIGIN, according to its TDLR filing.
How much does ATOS ORIGIN cost and how big is it?
ATOS ORIGIN has an estimated construction value of $235K, based on its TDLR filing.
๐Scope of Work
new tenant build-out in existing lease space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 6, 2011
Review Complete
Inspection Complete
Closed
Aug 1, 2011