SPEC SPACE
SPEC SPACE is a additions to existing building project at 6859 FAIRGROUNDS, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2011). The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJB1811854Project Closed
Project has been completed and closed
SPEC SPACE is a Additions to Existing Building project located at 6859 FAIRGROUNDS, San Antonio, TX 78238 in San Antonio, Texas. The project has an estimated value of $80K. CAVENDER HILL PROPERTIES is the property owner and VILLA PARK ARCHITECTURE is the design firm of record. The project was registered with TDLR on May 10, 2011.
โFrequently Asked Questions
What is SPEC SPACE?
SPEC SPACE is a additions to existing building project at 6859 FAIRGROUNDS in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: IFO to existing shell building
Is SPEC SPACE open in San Antonio?
Construction on SPEC SPACE is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2011. The building is finished and very likely open.
Where is SPEC SPACE located?
SPEC SPACE is located at 6859 FAIRGROUNDS, San Antonio, TX, 78238, in Bexar County.
Who is the owner or developer of SPEC SPACE?
CAVENDER HILL PROPERTIES is the property owner/developer of record for SPEC SPACE, per its TDLR project registration.
Who is the architect or design firm for SPEC SPACE?
VILLA PARK ARCHITECTURE is the design firm of record for SPEC SPACE, according to its TDLR filing.
How much does SPEC SPACE cost and how big is it?
SPEC SPACE has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
IFO to existing shell building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 10, 2011
Review Complete
Inspection Complete
Closed
Aug 1, 2011