SPEED STOP #105
SPEED STOP #105 is a additions to existing building project at 5003 OVERPASS RD., Buda, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2014). The project has an estimated value of $275K.
๐Project Metrics
TDLR #EABPRJB1812088Project Closed
Project has been completed and closed
SPEED STOP #105 is a Additions to Existing Building project located at 5003 OVERPASS RD., Buda, TX 78610 in Buda, Texas. The project has an estimated value of $275K. SPEEDY STOP FOOD STORES LLC is the property owner and 4 1 DESIGN + is the design firm of record. The project was registered with TDLR on May 16, 2011.
โFrequently Asked Questions
What is SPEED STOP #105?
SPEED STOP #105 is a additions to existing building project at 5003 OVERPASS RD. in Buda, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition to the building for Restrooms; also new floor in building and extension of refrigerated cooler.
Is SPEED STOP #105 open in Buda?
Construction on SPEED STOP #105 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2014. The building is finished and very likely open.
Where is SPEED STOP #105 located?
SPEED STOP #105 is located at 5003 OVERPASS RD., Buda, TX, 78610, in Hays County.
Who is the owner or developer of SPEED STOP #105?
SPEEDY STOP FOOD STORES LLC is the property owner/developer of record for SPEED STOP #105, per its TDLR project registration.
Who is the architect or design firm for SPEED STOP #105?
4 1 DESIGN + is the design firm of record for SPEED STOP #105, according to its TDLR filing.
How much does SPEED STOP #105 cost and how big is it?
SPEED STOP #105 has an estimated construction value of $275K, based on its TDLR filing.
๐Scope of Work
Addition to the building for Restrooms; also new floor in building and extension of refrigerated cooler.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 16, 2011
Review Complete
Inspection Complete
Closed
Mar 1, 2014
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Furnace in closet.
Request for disconnect and reconnect. Bringing main electrical service up to code. replacing meter service riser grounding system breakers and adding surge protection.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system. 2 in total
Express: Replace 29 existing windows - size for size