JOS. A. BANK
JOS. A. BANK is a renovation/alteration project at 5779 SOUTH BROADWAY AVE., Tyler, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2011). The project has an estimated value of $156K.
๐Project Metrics
TDLR #EABPRJB1812515Project Closed
Project has been completed and closed
JOS. A. BANK is a Renovation/Alteration project located at 5779 SOUTH BROADWAY AVE., Tyler, TX 75073 in Tyler, Texas. The project has an estimated value of $156K. BURNS COMMERCIAL is the property owner and CALVIN J. COATSWORTH AIA is the design firm of record. The project was registered with TDLR on May 23, 2011.
โFrequently Asked Questions
What is JOS. A. BANK?
JOS. A. BANK is a renovation/alteration project at 5779 SOUTH BROADWAY AVE. in Tyler, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior alteration to include architectural, mechanical, electrical and plumbing.
Is JOS. A. BANK open in Tyler?
Construction on JOS. A. BANK is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2011. The building is finished and very likely open.
Where is JOS. A. BANK located?
JOS. A. BANK is located at 5779 SOUTH BROADWAY AVE., Tyler, TX, 75073, in Smith County.
Who is the owner or developer of JOS. A. BANK?
BURNS COMMERCIAL is the property owner/developer of record for JOS. A. BANK, per its TDLR project registration.
Who is the architect or design firm for JOS. A. BANK?
CALVIN J. COATSWORTH AIA is the design firm of record for JOS. A. BANK, according to its TDLR filing.
How much does JOS. A. BANK cost and how big is it?
JOS. A. BANK has an estimated construction value of $156K, based on its TDLR filing.
๐Scope of Work
Interior alteration to include architectural, mechanical, electrical and plumbing.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 23, 2011
Review Complete
Inspection Complete
Closed
Oct 1, 2011