Project has been completed and closed
FLOWERS BAKING CO is a Additions to Existing Building project located at 412 COMMERCIAL, Buda, TX 78610 in Buda, Texas. The project has an estimated value of $85K. TERVELT PROPERTIES TEXAS LLC is the property owner and HOOVER & ASSOCIATES is the design firm of record. The project was registered with TDLR on August 23, 2011.
1200 sf warehouse addition
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Aug 23, 2011
Review Complete
Inspection Complete
Closed
Jan 1, 2012
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
2026/03/12 - 2026/03/16 | (2026/03/11 - 2026/03/17) | The project involves the temporary installation of window branding for an SXSW-related activation at the venue. The branding consists of adhesive vinyl graphics applied to exterior window surfaces as well as several removable elements including magnetic panels and one lightweight foam board (Forex/Phorex) panel. #SXSWAffiliated #TPWOnly (location: Speakeasy Austin) ยฟ attaching branding to Speakeasy facade Some magnetic branding elements are secured using corresponding magnets placed on the interior side of the windows. No permanent fixtures or structural attachments will be made to the building faรงade. Installation Method: All installation and removal work will be carried out manually by a small production team using standard step ladders. No scissor lifts vehicles cranes or heavy machinery will be used. Right-of-Way Impact: Work will take place directly adjacent to the building faรงade along the sidewalk. Ladders and staff will temporarily occupy a small portion of the sidewalk directly in front of the windows during installation and removal. Pedestrian access will be maintained at all times. No street lanes parking spaces or bike lanes will be closed or impacted. Schedule Initial installation March 11 10:00 AM ยฟ 6:00 PM Branding adjustment (lower windows switching to Berlin House imagery) March 14 8:00 ยฟ 10:00 AM Branding reset (switching back to German Haus branding) March 15 8:00 ยฟ 10:00 AM Removal of all branding March 17 8:00 AM ยฟ 12:00 PM Traffic Control: A small temporary work zone will be established immediately adjacent to the building faรงade on the sidewalk. Step ladders will be used and monitored by staff at all times. Pedestrian access will remain open and safe passage will be maintained. No roadway parking or bike lane closures are required.
Replace gas water heater
EV charger installation
Install new 3.96 kW DC rooftop solar system to existing residential