THE METHODIST HOSPITAL is a renovation/alteration project at 6565 FANNIN ST., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2012). The project has an estimated value of $1.7M.
Project has been completed and closed
THE METHODIST HOSPITAL is a Renovation/Alteration project located at 6565 FANNIN ST., Houston, TX 77030 in Houston, Texas. The project has an estimated value of $1.7M. METHODIST HOSPITAL, THE is the property owner and WESTLAKE REED LESKOSKY is the design firm of record. The project was registered with TDLR on September 26, 2011.
THE METHODIST HOSPITAL is a renovation/alteration project at 6565 FANNIN ST. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of Interior finishes, in fill window openingsbetween patient rooms and replacing interior doors.
Construction on THE METHODIST HOSPITAL is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2012. The building is finished and very likely open.
THE METHODIST HOSPITAL is located at 6565 FANNIN ST., Houston, TX, 77030, in Harris County.
METHODIST HOSPITAL, THE is the property owner/developer of record for THE METHODIST HOSPITAL, per its TDLR project registration.
WESTLAKE REED LESKOSKY is the design firm of record for THE METHODIST HOSPITAL, according to its TDLR filing.
THE METHODIST HOSPITAL has an estimated construction value of $1.7M, based on its TDLR filing.
Renovation of Interior finishes, in fill window openingsbetween patient rooms and replacing interior doors.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 26, 2011
Review Complete
Inspection Complete
Closed
Sep 1, 2012