SWIFT ENERGY is a renovation/alteration project at 16825 NORTHCHASE DRIVE Suite 400, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2012). The project has an estimated value of $550K.
๐Project Metrics
TDLR #EABPRJB2801438Project Closed
Project has been completed and closed
SWIFT ENERGY is a Renovation/Alteration project located at 16825 NORTHCHASE DRIVE Suite 400, Houston, TX 77060 in Houston, Texas. The project has an estimated value of $550K. HINES INTERESTS is the property owner and GENSLER is the design firm of record. The project was registered with TDLR on October 3, 2011.
โFrequently Asked Questions
What is SWIFT ENERGY?
SWIFT ENERGY is a renovation/alteration project at 16825 NORTHCHASE DRIVE Suite 400 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of interior office space on Level 8 in a highrise office building
Is SWIFT ENERGY open in Houston?
Construction on SWIFT ENERGY is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2012. The building is finished and very likely open.
Where is SWIFT ENERGY located?
SWIFT ENERGY is located at 16825 NORTHCHASE DRIVE Suite 400, Houston, TX, 77060, in Harris County.
Who is the owner or developer of SWIFT ENERGY?
HINES INTERESTS is the property owner/developer of record for SWIFT ENERGY, per its TDLR project registration.
Who is the architect or design firm for SWIFT ENERGY?
GENSLER is the design firm of record for SWIFT ENERGY, according to its TDLR filing.
How much does SWIFT ENERGY cost and how big is it?
SWIFT ENERGY has an estimated construction value of $550K, based on its TDLR filing.
๐Scope of Work
Renovation of interior office space on Level 8 in a highrise office building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 3, 2011
Review Complete
Inspection Complete
Closed
Mar 1, 2012