TPS AUSTIN REMODEL is a renovation/alteration project at 10024 N. CAPITAL OF TEXAS HWY, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2012). The project has an estimated value of $200K.
Project has been completed and closed
TPS AUSTIN REMODEL is a Renovation/Alteration project located at 10024 N. CAPITAL OF TEXAS HWY, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $200K. GVM HOTEL PARTNERS LLC is the property owner and MAYSE & ASSOICATES INC is the design firm of record. The project was registered with TDLR on October 6, 2011.
TPS AUSTIN REMODEL is a renovation/alteration project at 10024 N. CAPITAL OF TEXAS HWY in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to add a breakfast room, accessibility enhancements
Construction on TPS AUSTIN REMODEL is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2012. The building is finished and very likely open.
TPS AUSTIN REMODEL is located at 10024 N. CAPITAL OF TEXAS HWY, Austin, TX, 78759, in Travis County.
GVM HOTEL PARTNERS LLC is the property owner/developer of record for TPS AUSTIN REMODEL, per its TDLR project registration.
MAYSE & ASSOICATES INC is the design firm of record for TPS AUSTIN REMODEL, according to its TDLR filing.
TPS AUSTIN REMODEL has an estimated construction value of $200K, based on its TDLR filing.
Renovation to add a breakfast room, accessibility enhancements
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 6, 2011
Review Complete
Inspection Complete
Closed
Feb 1, 2012
Building permits found at or near this location
Install new 13.8kW rooftop solar system to existing residential only using a line side tap.
Replace sewer line from the home to the city tap connection total length of 80 feet.
Install EVSE
Construction of a dumpster encloser.
installing standby generator