BPC
BPC is a additions to existing building project at 3115 SOUTHWEST LOOP, Carthage, in Panola County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2012). The project has an estimated value of $1.9M.
๐Project Metrics
TDLR #EABPRJB2802700Project Closed
Project has been completed and closed
BPC is a Additions to Existing Building project located at 3115 SOUTHWEST LOOP, Carthage, TX 75633 in Carthage, Texas. The project has an estimated value of $1.9M. BAKER HUGHES OILFIELD OPERATIONS INC. is the property owner and ENERGY ARCHITECTURE is the design firm of record. The project was registered with TDLR on October 27, 2011.
โFrequently Asked Questions
What is BPC?
BPC is a additions to existing building project at 3115 SOUTHWEST LOOP in Carthage, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New office building will be added to existing metal building.
Is BPC open in Carthage?
Construction on BPC is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2012. The building is finished and very likely open.
Where is BPC located?
BPC is located at 3115 SOUTHWEST LOOP, Carthage, TX, 75633, in Panola County.
Who is the owner or developer of BPC?
BAKER HUGHES OILFIELD OPERATIONS INC. is the property owner/developer of record for BPC, per its TDLR project registration.
Who is the architect or design firm for BPC?
ENERGY ARCHITECTURE is the design firm of record for BPC, according to its TDLR filing.
How much does BPC cost and how big is it?
BPC has an estimated construction value of $1.9M, based on its TDLR filing.
๐Scope of Work
New office building will be added to existing metal building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 27, 2011
Review Complete
Inspection Complete
Closed
Apr 1, 2012