Zabalist
ZabalistTexas Construction
🏠 Home
📋 Directory
💎 Pricing📊 Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

✓ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

© 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Hays
🏁Project Closed🏗️ New Construction💵 This project is privately funded, on private land for private use.

WALGREENS #15156

6205 FM 2770, Kyle, TX 78640, Kyle, TX, 78640
Completed100%

📊Project Metrics

TDLR #EABPRJB2804506
$1.6M
Project Value
—
Square Feet
—
Cost/SqFt
7 months
Duration
Registered:Dec 6, 2011
Start:Jan 1, 2012
Target:Aug 1, 2012
🏁

Project Closed

Project has been completed and closed

WALGREENS #15156 is a New Construction project located at 6205 FM 2770, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $1.6M. PLUM CREEK PARTNERS LTD is the property owner and IDENTITY ARCHITECTS is the design firm of record. The project was registered with TDLR on December 6, 2011.

📋Scope of Work

Ground up construction of retail pharmacy with attacheddrive thru and associated site work.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

📅Compliance Timeline

Project Registered
December 6, 2011
Project Closed
August 1, 2012
Construction Start
January 1, 2012
Expected Completion
August 1, 2012

📅Project Timeline

Filed

Dec 6, 2011

Review Complete

Inspection Complete

Closed

Aug 1, 2012

📍Location & Views

Open in MapsGet Directions|30.01317, -97.89085

🔗Related Projects

🏛️Same Design Firm

$1.7M total
Houston Metro Urology
Houston·$750K
Dr Soni Expansion - Suite 390
Cypress·$245K
MEMORIAL HERMANN
Houston·$410K
MH CONFERENCE CENTER SERVERY
Houston·$305K

📄Related City Permits

Building permits found at or near this location

6205 BURK BURNETT CT
14.34 mi away

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutMar 2026
View Details
2026-037818 MP
🔧Alamo Austin Air Conditioning & Heating Inc
6205 MARSHALL RANCH RD
19.14 mi away

ePlan: Residential Expedited Review - New Autofill/Heated pool

ActiveElectrical PermitNewMar 2026
View Details
2025-124070 EP
🔧Energy Electric Services LLC
6205 N LAMAR BLVD
24.11 mi away

We will be removing the existing failing grease interceptor and installing a new code¿compliant grease trap in the same general location. Work includes excavation demolition of the existing interceptor installation of new piping connections setting the new interceptor and restoring the work area to grade. Detailed Scope: Excavate to expose the existing grease trap and associated inlet/outlet piping. Disconnect and remove the existing grease interceptor including damaged or non¿compliant piping sections. Install a new (City¿approved) grease interceptor sized per fixture count and City of Austin Industrial Waste requirements. Set the new unit on a properly compacted and leveled base. Reconnect all inlet and outlet plumbing using approved materials and fittings. Install new cleanouts as required by current code. Ensure proper flow line elevations and venting per Austin Water and UPC/IPC requirements. Backfill and compact the excavation area; restore concrete/asphalt or surface material as needed. Perform final testing for watertightness flow and proper operation. Submit required SAWS/Industrial Waste documentation including as¿built information and fixture count verification. No changes to existing building water distribution or sewer layout beyond the grease trap connections. All work will comply with City of Austin Plumbing Code Industrial Waste regulations and Whataburger operational safety requirements.

FinalPlumbing PermitGrease Interceptor (GI) replacementFeb 2026
View Details
2026-016955 PP
🔧Southwaste Disposal
6205 NASCO DR
24.19 mi away

Generator gas line

FinalPlumbing PermitRepairMar 2026
View Details
2026-037617 PP
🔧My Plumber is a Nerd
6205 NASCO DR
24.19 mi away

Install ATS to back up sub panel at main house. Install 38KW generator.

ActiveElectrical PermitRepairMar 2026
View Details
2026-022416 EP
🔧Bird's Eye Electric

Quick Actions

View on TDLRSatellite View
TDLR ID: EABPRJB2804506

Property Owner

👤
PLUM CREEK PARTNERS LTD
Contact: Registered by TDLR
View all projects
STEVE HELBLE 301 CONGRESS, SUITE 1550, AUSTIN, TX 78701
(512) 329-9947

Design Firm

🏛️
IDENTITY ARCHITECTS
4 projects · $1.7M
View all projects
DAVID KASTENDIECK 111 TRAVIS STREET, HOUSTON, TX 77002
(713) 595-2150

Explore Area

🏙️
Kyle
View city projects
🗺️
Hays County
View county projects
📮
ZIP 78640
View zip code projects

Find Professionals

🔨
Contractors in Kyle
Licensed contractors directory
🏗️
Builders in Kyle
Home & commercial builders
📐
Architects in Kyle
Architecture & design firms

Need a contractor for this project?

Browse verified general contractors active in Hays County

Find General Contractors in Hays

Get alerts for Hays

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects