TEXAS MEDICAL SERVICES - PHASE 2
TEXAS MEDICAL SERVICES - PHASE 2 is a renovation/alteration project at 6505 AIRPORT BLVD. Suite 100, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2012). The project has an estimated value of $150K.
๐Project Metrics
TDLR #EABPRJB2805546Project Closed
Project has been completed and closed
TEXAS MEDICAL SERVICES - PHASE 2 is a Renovation/Alteration project located at 6505 AIRPORT BLVD. Suite 100, Austin, TX 78752 in Austin, Texas. The project has an estimated value of $150K. LAMY-ARCADIA LLC is the property owner and SLG ARCHITECTS INC. is the design firm of record. The project was registered with TDLR on December 26, 2011.
โFrequently Asked Questions
What is TEXAS MEDICAL SERVICES - PHASE 2?
TEXAS MEDICAL SERVICES - PHASE 2 is a renovation/alteration project at 6505 AIRPORT BLVD. Suite 100 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 9,128 square foot tenant finish expansion into an existing building.
Is TEXAS MEDICAL SERVICES - PHASE 2 open in Austin?
Construction on TEXAS MEDICAL SERVICES - PHASE 2 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2012. The building is finished and very likely open.
Where is TEXAS MEDICAL SERVICES - PHASE 2 located?
TEXAS MEDICAL SERVICES - PHASE 2 is located at 6505 AIRPORT BLVD. Suite 100, Austin, TX, 78752, in Travis County.
Who is the owner or developer of TEXAS MEDICAL SERVICES - PHASE 2?
LAMY-ARCADIA LLC is the property owner/developer of record for TEXAS MEDICAL SERVICES - PHASE 2, per its TDLR project registration.
Who is the architect or design firm for TEXAS MEDICAL SERVICES - PHASE 2?
SLG ARCHITECTS INC. is the design firm of record for TEXAS MEDICAL SERVICES - PHASE 2, according to its TDLR filing.
How much does TEXAS MEDICAL SERVICES - PHASE 2 cost and how big is it?
TEXAS MEDICAL SERVICES - PHASE 2 has an estimated construction value of $150K, based on its TDLR filing.
๐Scope of Work
9,128 square foot tenant finish expansion into an existing building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 26, 2011
Review Complete
Inspection Complete
Closed
Jun 1, 2012
๐Related Projects
๐๏ธSame Design Firm
$64.8M total๐Related City Permits
Building permits found at or near this location
Express: Replacing 4 windows (like for like)
200-amp underground service rebuild
New in-ground spa with required enclosure (heater or autofill)
Replacement of an existing water heater WATER HEATER TANKLESS CHANGE-OUT
Replacement of complete existing central heat and air system with or without duct work Replaced upstairs complete AC system no ductwork replaced.