๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

CP311643 MAI: DEAN OF UNDEGRAD OFFICE

#1 SOUTH MALL 2nd Floor, Austin, TX 78705, Austin, TX, 78705
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB2807060
$950K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
4 months
Duration
Registered:Jan 30, 2012
Start:Mar 1, 2012
Target:Jul 1, 2012
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

RENOVATION PROJECT FOR UNDERGRADUATE STUDIES ON 2ND FLROF MAIN BLDG. VA175

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
January 30, 2012
Project Closed
July 1, 2012
Construction Start
March 1, 2012
Expected Completion
July 1, 2012

๐Ÿ“Location & Views

Open in MapsGet Directions|30.28448, -97.73952

๐Ÿ“„Related City Permits

Building permits found at or near this location

105 E 5TH ST UNIT 200
1.23 mi away

Establish a new 120/208V 200A 3Ph 4W main electrical service to feed a panel on the 2nd floor

ActiveElectrical PermitRemodelFeb 2026
View Details
2026-022113 EP
๐Ÿ”งParker Electric
1717 W 6TH ST UNIT 102
1.64 mi away

Interior remodel to existing office space. Minor MEP Scope. No Access Control.

ActiveMechanical PermitRemodelFeb 2026
View Details
2025-158189 MP
๐Ÿ”งTeam Services
1809 BLUEBONNET LN
2.94 mi away

Inground pool and spa - remove existing impervious coverage from driveway (creating driveway strips) removing existing sidewalk and uncovered patio pad. Impervious coverage at 44.9% Impervious coverage survey may be required at inspection stage

ActivePlumbing PermitNewFeb 2026
View Details
2025-136544 PP
๐Ÿ”งGREENGO PLUMBING SERVICES LLC
1911 OHLEN RD
5.37 mi away

Tunnel under foundation to remove cast iron for 1 full bathroom and one half bathroom kitchen and washer drain. There will be 2 access holes will be made on the outside of the home one in the back where kitchen is located and the second where drain line exits the foundation. Total length of tunnel is approximately 70 feet. Sewer line will also be replaced from the home to the city tap connection total length of sewer line is approximately 80 feet.

ActivePlumbing PermitRepairFeb 2026
View Details
2026-020220 PP
๐Ÿ”งCalixto Plumbing
11821 BITTERN HOLW UNIT 2
8.07 mi away

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutFeb 2026
View Details
2026-021370 MP
๐Ÿ”งSERVICE WIZARD LLC

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists